272 - AQ-H02 | Ground Support Independent Witness Hold & Release
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AQ-H02 — GROUND SUPPORT INDEPENDENT WITNESS HOLD & RELEASE
AQ-H02 is the original five-gate independent witness hold and release form for mine ground support. It demands witnessed proof for pre-entry scaling, traceable support tests, barricaded safe access, changed ground and mine engineer hold-point approval.
WHEN TO USE THIS UNDERGROUND SAFETY RECORD
Use this source before handing back a mine support face or transferring to another crew. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR and relate all five holds to the current geotechnical design and work order.
FIVE ACTUAL WITNESS HOLD ITEMS
1. Pre-entry barring/scaling inspection carried out under approved procedure
2. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability
3. No drilling or scaling outside approved supported and barricaded workface
4. Seismic, blast and changed ground conditions trigger re-examination
5. Hold points identify test frequency and mine engineer release authority
HOW TO COMPLETE THE SOURCE'S EVIDENCE TABLE
Complete real HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS fields with original source documents, test sheets, named mine witnesses, proof of corrected defects and valid release reference. Missing proof means HOLD.
GROUND SUPPORT FAILURE AND OPERATOR RELEASE
The RELEASE CONDITION explicitly requires all applicable holds PASS, approved work-order traceability and witnessed corrections. Only a named mine official can grant return-to-service; a contractor signature does not release unsupported ground.
DEFECTS, WITNESSES AND FINAL ACCEPTANCE
The original records contractor supervisor and host mine authority signatures where required, and Date / release reference. The mine official's decision is the only valid release.
SOURCE WORD SINGLE OR COMPLETE MINE COLLECTIONS
The R12.95 editable AQ-H02 Word original is already within the 371-original Underground Mining Checklist Package and the full 628-page Contractor H&S File. If you own either containing collection, do not buy this form twice. Current geotechnical design, mine COPs, appointments and engineer-approved release govern work.
THREE BLUE AVC CROSS-LINKS
Browse AVC original editable checklist Singles

