272 / AQ-H02 — HIGHWALL & BENCH INDEPENDENT INSPECTION, WITNESS AND HANDBACK
AQ-H02 is AVC's original five-gate editable Word INDEPENDENT INSPECTION, witness and handback record for highwall and bench geotechnical monitoring support. It verifies mine-owned instrument thresholds, current trigger-response rules and fall-of-ground protections before a restricted area or system is released.
WHY THIS HIGHWALL EVIDENCE MATTERS
Reinstating a monitoring camera or radar instrument can alter thresholds while active ground movement or a fresh blast creates new hazards. Independent mine verification must confirm TARP trigger interpretations, shift changes and any outstanding alarms; a contractor maintenance completion note does not release a pit crest.
FIVE ORIGINAL INDEPENDENT HOLD GATES
1. Mine owner verifies radar, prism, crack monitors and their alarm thresholds. 2. TARP sets current warning, withdrawal and restart conditions. 3. Rain, seismic, dewatering, blast damage and progressive failure reviewed per shift.
4. Fall-of-ground barricades and no-go areas intact during monitoring maintenance. 5. All monitoring trends and alarms promptly escalated to geotechnical authority.
SOURCE WORD FIELDS, TRUE EVIDENCE AND MINE RELEASE
Fill MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. For each printed evidence gate complete REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. The original has exactly FIVE HOLD TRIGGER / EVIDENCE GATE items with REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. All gates must pass, defects must be resolved and a mine-authorised official must record a RELEASE. It is not the seven-row measured radar results record.
Separate CONTRACTOR SUPERVISOR / SIGNATURE and MINE RELEASE AUTHORITY / SIGNATURE, with DATE / RELEASE REF, record the mine's decision; independent verification is not authorisation.
THIS ONE WORD SINGLE OR THE COMPLETE MINE SYSTEM?
This identical original editable purchaser-licensed DOCX is ALREADY INCLUDED in the complete 386-document Surface Mining Checklist Package and the full Contractor H&S File with core controls and specialist annexures. Existing larger-set buyers already own it. The host mine's current geotechnical hazard map, TARP, monitoring threshold and release authority always govern access.