top of page

270 - AQ-C03 | Ground Support Condition Change & Emergency Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL WORD | R12.95

AQ-C03 — GROUND SUPPORT CONDITION CHANGE & EMERGENCY CHECKLIST

AQ-C03 is the original seven-control change-of-condition and emergency-protection checklist for mine ground support, scaling and rock rehabilitation. Its first printed item requires completed ground support to be formally inspected and released before others enter.

WHERE AND WHEN THIS ORIGINAL APPLIES

Use it after changed seismic or blast conditions, a new fracture, altered access, an unexpected void or a test hold failure. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR against the affected mine zone.

SEVEN GROUND SUPPORT WORKFACE SAFETY CHECKS

1. Completed ground support inspected and released before others enter

2. Hold points identify test frequency and mine engineer release authority

3. Seismic, blast and changed ground conditions trigger re-examination

4. No drilling or scaling outside approved supported and barricaded workface

5. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability

6. Pre-entry barring/scaling inspection carried out under approved procedure

7. Competent rock engineer defines zone, unsupported span and safe access sequence

HOW TO COMPLETE THIS EXACT SOURCE TABLE

The seven source WORKFACE VERIFICATION / REQUIRED CONTROL rows use Y, N, N/A and EVIDENCE / DEFECT / ACTION. Explain each NO or N/A, attach current mine COP/SOP and approved work-order proof, and document actual test/release, barricade, traceability and scaling evidence.

CRITICAL MINE ENGINEERING STOP AND RELEASE

The source HOLD rule requires stopping without mine clearance, emergency protection or critical proof, and reassessment after shift or condition change. Rock engineer and mine officials own the decision to re-enter a changed or unstable ground zone.

REVIEW AND DOCUMENTED EVIDENCE

The source provides REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, contractor supervisor and host mine authority signatures where required and actual Date / release reference. A completed form never issues a permit.

SINGLE EDITABLE WORD OR COMPLETE MINE COLLECTIONS

This R12.95 authentic editable AQ-C03 Word original is already included in the 371-form Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing buyers of either collection should not purchase it again. Current mine COPs, appointed rock engineer decisions, permits and approved support work govern all use.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original editable checklist Singles

371-original Underground Mining Checklist Package

Complete Underground Mining Contractor H&S File — 628 pages

    bottom of page