top of page

270 - AQ-00 | Highwall & Geotechnical Work-Order Activation

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: buy five for four, ten for eight or fifteen for twelve. Confirm the cart offer.

Browse all checklist Singles

270 / AQ-00 — HIGHWALL & BENCH WORK-ORDER ACTIVATION AND MINE ACCEPTANCE

AQ-00 is the original one-page editable Word work-order ACTIVATION and mine acceptance record for slope-monitoring, highwall support and scaling-access contractors. SIX printed questions confirm that the current mine geotechnical hazard zone, engineering authority and surveillance restrictions are accepted before contractor mobilisation.

THE HIGHWALL RISK AND APPROVAL THAT THIS RECORD ADDRESSES

Even a routine monitoring-maintenance purchase order does not authorise entry below an unstable bench or across fall-of-ground barriers. The responsible engineer, live radar/prism thresholds and TARP determine what work can occur, under what warning criteria and who can stop or release it.

SIX ORIGINAL MINE ACTIVATION QUESTIONS

1. Mine hazard map identifies geotechnical instability areas and monitoring alarms. 2. Mine geotechnical engineer approves crest/toe access, drilling or surveying. 3. Mine owner controls radar, prism and crack instrument thresholds.

4. TARP defines warning, withdrawal and restart conditions. 5. Rain, seismic movement, dewatering, blast damage and progressive failure checked. 6. Fall-of-ground barricades and no-go areas intact during instrument maintenance.

SOURCE FORM FIELDS, EVIDENCE AND CONTROLLING RELEASE

The real source has THREE columns: ACTIVATION / CONTROL QUESTION, DOCUMENT / PERMIT / EVIDENCE REFERENCE and OWNER / ACCEPTANCE for SIX questions, not a Y/N checklist or measured-sensor log. Link the actual geotechnical map, written engineer decision, current monitor/TARP records and exclusion plan to their responsible approving mine owner.

The source REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES has separate CONTRACTOR SUPERVISOR / SIGNATURE and MINE RELEASE AUTHORITY / SIGNATURE with DATE / RELEASE REF. The activation is only for that mine zone, task and authorisation; a contractor cannot approve its own pit access.

BUY THE INDIVIDUAL FORM OR COMPLETE MINING SYSTEM?

This exact original editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the full Contractor H&S File, together with core safety and specialist trade controls. Buyers of either full collection already receive this form without buying it separately. All live geotechnical thresholds, TARP responses, access permits and re-entry releases remain subject to mine authority.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page