top of page

269 - AQ-C02 | Ground Support Shift & Area Readiness Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL WORD | R12.95

AQ-C02 — GROUND SUPPORT SHIFT & AREA READINESS CHECKLIST

AQ-C02 is the source-original seven-item shift and area readiness checklist for mine rock-support installation and rehabilitation. It begins with a competent engineer's definition of zone, unsupported span and safe access sequence and ends with inspected, released completed ground support.

WHERE AND WHEN THIS ORIGINAL APPLIES

Complete it before a new shift enters an approved bolting, scaling, shotcrete or mesh workface and whenever geotechnical conditions change. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR.

SEVEN GROUND SUPPORT WORKFACE SAFETY CHECKS

1. Competent rock engineer defines zone, unsupported span and safe access sequence

2. Pre-entry barring/scaling inspection carried out under approved procedure

3. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability

4. No drilling or scaling outside approved supported and barricaded workface

5. Seismic, blast and changed ground conditions trigger re-examination

6. Hold points identify test frequency and mine engineer release authority

7. Completed ground support inspected and released before others enter

HOW TO COMPLETE THIS EXACT SOURCE TABLE

For each printed WORKFACE VERIFICATION / REQUIRED CONTROL, tick Y, N or N/A and record EVIDENCE / DEFECT / ACTION. Verify actual pre-entry scaling, material/torque test batches, barricaded safe limits, changed-ground reassessment, engineer-owned test hold points and released support.

CRITICAL MINE ENGINEERING STOP AND RELEASE

The source requires a HOLD for missing mine-authorised clearance, isolation, emergency system or critical support evidence. A shift-ready tick cannot override an unsupported span or authorise restart after a ground movement warning.

REVIEW AND DOCUMENTED EVIDENCE

The source provides REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, contractor supervisor and host mine authority signatures where required and actual Date / release reference. A completed form never issues a permit.

SINGLE EDITABLE WORD OR COMPLETE MINE COLLECTIONS

This R12.95 authentic editable AQ-C02 Word original is already included in the 371-form Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing buyers of either collection should not purchase it again. Current mine COPs, appointed rock engineer decisions, permits and approved support work govern all use.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original editable checklist Singles

371-original Underground Mining Checklist Package

Complete Underground Mining Contractor H&S File — 628 pages

    bottom of page