268 - AQ-C01 | Ground Support Workface Prestart Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE ORIGINAL WORD | R12.95
AQ-C01 — GROUND SUPPORT WORKFACE PRESTART CHECKLIST
AQ-C01 is the authentic seven-control workface prestart checklist for underground support bolts, mesh, scaling, shotcrete and ground rehabilitation. It begins with the current mine geotechnical/support standard and approved design before any operation starts.
WHERE AND WHEN THIS ORIGINAL APPLIES
Use it immediately before entering an approved support installation or rock rehabilitation zone. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, checking the valid rock-engineering design revision and permit.
SEVEN GROUND SUPPORT WORKFACE SAFETY CHECKS
1. Current mine geotechnical/support standard and approved design obtained
2. Competent rock engineer defines zone, unsupported span and safe access sequence
3. Pre-entry barring/scaling inspection carried out under approved procedure
4. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability
5. No drilling or scaling outside approved supported and barricaded workface
6. Seismic, blast and changed ground conditions trigger re-examination
7. Hold points identify test frequency and mine engineer release authority
HOW TO COMPLETE THIS EXACT SOURCE TABLE
Its source-original table uses Y, N and N/A with EVIDENCE / DEFECT / ACTION. Check competent engineer span limits, pre-entry barring/scaling inspection, material batch/torque test records, barricaded access, changed seismic/blast conditions and defined test frequency and mine engineer release.
CRITICAL MINE ENGINEERING STOP AND RELEASE
The source explicitly says a checklist is not a work permit. Missing support proof or clearance triggers HOLD; new cracks, rock falls, seismic warnings or failed tests require mine-control withdrawal and engineer-led release.
REVIEW AND DOCUMENTED EVIDENCE
The source provides REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, contractor supervisor and host mine authority signatures where required and actual Date / release reference. A completed form never issues a permit.
SINGLE EDITABLE WORD OR COMPLETE MINE COLLECTIONS
This R12.95 authentic editable AQ-C01 Word original is already included in the 371-form Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing buyers of either collection should not purchase it again. Current mine COPs, appointed rock engineer decisions, permits and approved support work govern all use.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original editable checklist Singles

