top of page

267 - AQ-00 | Ground Support Annexure Activation & Evidence Index

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE ORIGINAL WORD | R12.95

AQ-00 — GROUND SUPPORT ANNEXURE ACTIVATION & EVIDENCE INDEX

AQ-00 is the original six-requirement annexure activation and evidence index for work involving mine bolts, mesh, shotcrete support, barring/scaling and rock rehabilitation. It determines which specialist support controls genuinely apply to the awarded scope and underground zone.

WHERE AND WHEN THIS ORIGINAL APPLIES

Use this at contractor workpack and safety-file activation rather than as a field prestart. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR against the approved geotechnical scope and mine instructions.

SIX SOURCE ANNEXURE ACTIVATION REQUIREMENTS

1. Current mine geotechnical/support standard and approved design obtained

2. Competent rock engineer defines zone, unsupported span and safe access sequence

3. Pre-entry barring/scaling inspection carried out under approved procedure

4. Support bolts, resin, shotcrete, mesh and torque tests retain batch traceability

5. No drilling or scaling outside approved supported and barricaded workface

6. Seismic, blast and changed ground conditions trigger re-examination

HOW TO COMPLETE THIS EXACT SOURCE TABLE

The genuine three-column source is ACTIVATION REQUIREMENT, EVIDENCE / ACCEPTANCE REFERENCE and STATUS / OWNER. Enter six exact requirements: current approved support standard/design, competent engineer access limits, pre-entry scaling procedure, bolt/resin/shotcrete/mesh/torque traceability, barricades and seismic/blast reassessment.

CRITICAL MINE ENGINEERING STOP AND RELEASE

The index establishes evidence ownership but does not authorise entry, unsupported drilling or ground release. The source has contractor/mine review and actual Date / release reference fields, subject to mine geotechnical controls.

REVIEW AND DOCUMENTED EVIDENCE

The source has a REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES section, contractor supervisor and host mine authority signatures where required and Date / release reference.

SINGLE EDITABLE WORD OR COMPLETE MINE COLLECTIONS

This R12.95 authentic editable AQ-00 Word original is already included in the 371-form Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing buyers of either collection should not purchase it again. Current mine COPs, appointed rock engineer decisions, permits and approved support work govern all use.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original editable checklist Singles

371-original Underground Mining Checklist Package

Complete Underground Mining Contractor H&S File — 628 pages

    bottom of page