266 - AT-00 | Testing/NDT Trade Scope and Work-Order Activation
Buy 4 Checklists, Get 1 Free
TRADE SAFETY PURPOSE
This actual AVC AT-00 editable Word is a specialist testing, NDT and commissioning source document for non-nuclear power plants and industrial outages. It records technical safety evidence, competent contractor checks and plant work-package conditions. A station licence, permit-to-work, competent examiner and independent owner release cannot be replaced by this form.
WHEN TO ACTIVATE OR CHECK
Complete the real SITE / UNIT, CONTRACTOR, WORK ORDER / REV and WORK AREA / ZONE before site work. Identify the exact asset tag, test method and current permits, competent team, risk assessment, approved isolation, simultaneous operations and operator technical custodian. Verify planned controls before removal of guards, test setup or any change in plant energy state.
REAL PRINTED WORD CONTROLS
This genuine source contains 8 original numbered trade scope-activation controls: 1. Work order/plant tag and approved scope match the intended trade task; 2. Applicable OHS, Construction Regulations and operator rules screened for this activity; 3. Trade-qualified personnel, inductions, medicals and authorisations in place; 4. Current risk assessment and accepted method statement briefed to the crew; 5. Permits, isolations, SIMOPS and safe work-area release agreed with operator; 6. Inspection and test plan, hold/witness points and documents identified; 7. Required specific forms and two trade toolbox talks activated in this section; 8. Handback, testing and release authorities identified before work starts.
REQUIRED ACCEPTANCE EVIDENCE
Eight source-original activation controls identify scope/work order, applicable OHS or Construction Regulations, competence/induction, risk brief, permits and hazardous energy, ITP witnesses, relevant forms and independent testing and handback authority. The selected trade does not authorise switching, isolation or energisation.
STATION TECHNICAL AUTHORITY
The power station operator, authorised control room and competent system owner alone issue effective plant work-area releases, isolation, test clearance, switching and restoration. Keep unverified measurements, nonconforming parts, missing inspector witness and unresolved plant changes on HOLD pending actual accepted evidence.
ORIGINAL EDITABLE WORD AND AVC OPTIONS
This source-identical editable AVC Word is R12.95 individually and is also included in the 277-document Power Generation & Industrial Outage Checklist Package and 525-page Power Generation Contractor H&S File. Avoid duplicate purchases. Eligible Singles may qualify for BUY 4 GET 1 FREE while the automatic checkout offer runs: five pay for four, ten for eight and fifteen for twelve. Check actual checkout; full packages excluded.