top of page

263 - AP-TT01 | Blasting Exclusion Critical Hazards & Crew Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.

Browse all individual checklist Singles

263 / AP-TT01 — BLASTING EXCLUSION CRITICAL HAZARDS AND CREW ACCOUNTABILITY

AP-TT01 is an original one-page editable Word critical hazards and crew-accountability briefing for mine-controlled blast events. Its opening requirement draws the essential responsibility line: the MINE BLAST OFFICER controls explosives, firing and all-clear; contractors work only within their specific authorised support role.

WHY THIS ORIGINAL MINE BLAST CONTROL MATTERS

When several trades share a blast-adjacent workface, someone may confuse a contractor's permit with permission to enter a controlled exclusion area. Crew omissions, wrong blast maps, inoperable sirens or unsecured plant can expose workers to flyrock and post-blast hazards. A correctly briefed crew knows when to withdraw and which mine authority to notify.

THE SIX ORIGINAL CREW BRIEFING SUBJECTS

1. Mine blast officer retains explosives, firing and clearance authority; contractor scope defined. 2. Current controlled blast exclusion map and refuge routes issued. 3. Account for contractor crews, vehicles and subcontractors before evacuation.

4. Test radios, warning sirens, blast timetable and boundary marshals. 5. Move and secure contractor plant outside blast/flyrock exposure zones. 6. Recognise post-blast fume, dust, unstable ground and unexploded remnants.

CREW ATTENDANCE, STOP RULE AND AUTHORITY

Record MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER, then use all 16 original NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE lines. The source lists six true controls: blast officer authority, controlled exclusion/refuge map, people/vehicle accounting, warning communications, safe plant position and post-blast fumes/ground/remnants. It provides 16 crew attendance lines and a stop rule, NOT a blast charging procedure or clearance certificate.

STOP / WITHDRAW / NOTIFY MINE CONTROL for suspected misfire, unclear all-clear, exclusion breach or unstable post-blast wall; only the mine-authorised official releases the zone.

INDIVIDUAL EDITABLE WORD OR THE COMPLETE MINE COLLECTION?

This exact original purchaser-licensed editable DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor Health & Safety File. Buyers of either larger set receive this form alongside wider site and specialist controls, rather than purchasing it separately. Blasting, explosives and site-clearance authority always remain with the mine.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page