top of page

258 - AP-R01 | Blasting Support Competence, Permits & Plant

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.

Browse all individual checklist Singles

258 / AP-R01 — BLASTING SUPPORT COMPETENCE, PERMITS AND PLANT IDENTIFICATION

AP-R01 is the original one-page editable Word permits, competence and plant/work-zone evidence register for contractors authorised to support—but not undertake—mine-controlled blast events. Seven printed evidence topics connect contractor scope, personnel and plant to actual blast officer permission and exclusion controls.

WHY VERIFIED POST-BLAST EVIDENCE MATTERS

A subcontractor can be experienced and still be in the wrong blast zone if its work order, plant location or refuge map is out of date. Radio checks and headcounts must include all relevant parties. The mine controls the firing and re-entry process regardless of the contractor's own training certificates.

SEVEN ORIGINAL WORKFACE EVIDENCE ROWS

1. Blast officer exclusively controls explosives, firing and clearance. 2. Blast exclusion routes/map revision issued to contractor supervisor. 3. Account for workforce, subcontractors and vehicles before evacuation. 4. Radios, sirens, blast schedule and perimeter marshals function verified.

5. Contractor plant parked outside blast/flyrock damage area. 6. Recognise fumes, dust, rock instability and unexploded-charge exposure. 7. No re-entry before blast officer and geotechnical authority release.

ENTER REAL EVIDENCE, WITNESS AND MINE AUTHORITY

Fill MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. The source provides MINING-SPECIFIC ITEM / EVIDENCE TO TRACK, DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS for seven checks. Enter actual competent-role, permission, equipment and blast-authority references in evidence attachments; the printed record has no separate driver-card or explosives-licence matrix.

Use the original OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF for unresolved issues. Contractor supervisor and MINE RELEASE AUTHORITY / SIGNATURE plus DATE / RELEASE REF remain separate; verification does not authorise re-entry.

THIS INDIVIDUAL WORD OR A COMPLETE SAFETY FILE?

The original editable purchaser-licensed DOCX is ALREADY INCLUDED in the full 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File. Buying either comprehensive set includes this form alongside management and specialist annexures; buyers of the full set need not buy it individually. Explosives, firing and clearance stay under host-mine control.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page