257 - AP-H02 | Ventilation Independent Witness Hold & Release
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AP-H02 — VENTILATION INDEPENDENT WITNESS HOLD & RELEASE
AP-H02 is the original five-gate independent witness hold and release record for underground ventilation fans, ducts and airflow controls. It deals with approved temporary routing, occupied-area gas tests, flame-retardant duct integrity, fan-loss communication and witnessed airflow testing.
WHEN THIS VENTILATION SOURCE APPLIES
Use it before the mine accepts a staged ventilation installation, system change or fan/duct maintenance return. Identify MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR for the affected mine ventilation district.
FIVE ORIGINAL MINE VENTILATION WITNESS HOLD GATES
1. Temporary airflow routing, stoppings and door settings approved before disturbance
2. Air quality and gas monitoring arranged for occupied affected districts
3. Duct support, flame-retardant materials and leakage testing accepted
4. Loss-of-fan and re-entry protocol communicated to all exposed crews
5. Airflow direction, volume, pressure and alarms recorded after works
HOW TO COMPLETE THE ACTUAL WORD RECORD
Complete the real HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS cells for five printed gates. Attach measured survey sheets, duct acceptance, authorised temporary routing, gas-monitoring evidence and actual loss-of-fan/re-entry briefings. Record named competent witnesses.
CRITICAL AIRFLOW AND MINE RE-ENTRY CONTROL
The source RELEASE CONDITION requires all applicable hold items PASS, evidence traceable to the approved work order and witnessed correction of defects. Only the named mine authority issues a valid release; a contractor's completed hold sheet is not occupancy permission.
EVIDENCE, SIGNATURES AND OPERATOR RELEASE
The genuine operator-owned RELEASE CONDITION records completion by the contractor but actual mine permission only by authorised mine personnel, with mine supervisor/host witness and Date / release reference.
EDITABLE WORD SINGLE OR COMPLETE MINE PRODUCTS
This original editable AP-H02 Word source costs R12.95 and is already included in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you own either collection, avoid buying it twice. Actual mine ventilation COPs, exposure limits, issued permits and operator release always govern use.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original editable checklist Singles