257 / AP-H02 — BLASTING EXCLUSION INDEPENDENT INSPECTION AND HANDBACK
AP-H02 is AVC's original editable Word FIVE-GATE independent inspection, witness and handback hold-point record for contractor interfaces with mine blasting and post-blast re-entry. The first source gate requires full headcount, followed by communication, plant security, residual hazard assessment and formal mine clearance.
WHY VERIFIED POST-BLAST EVIDENCE MATTERS
After a mine blast, a contractor may be eager to return to scaffolding, surveying or equipment while the blast zone is still under control. This form makes an independent witness check that personnel and plant are safe and that the mine blast authority—not the contractor—has released the affected zone after geotechnical examination.
FIVE ORIGINAL INDEPENDENT HOLD GATES
1. All contractor people, vehicles and subcontractors accounted before evacuation. 2. Warning radios, sirens, blast timetable and boundary marshals verified. 3. Contractor machinery safely parked beyond damage/flyrock zones.
4. Fumes, dust, unstable post-blast ground and unexploded-charge risks assessed. 5. No re-entry until mine blast authority clearance and geotechnical checks complete.
ENTER REAL EVIDENCE, WITNESS AND MINE AUTHORITY
Fill MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. The exact printed source has FIVE HOLD TRIGGER / EVIDENCE GATE rows with REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. There is no seven-row Y/N checklist and no contractor-held explosives clearance power. Match all five evidence references to the mine's blast-area log, headcount and re-entry release.
ALL five independent gates and defects must be verified before the mine official records valid RELEASE; contractor and MINE RELEASE AUTHORITY signatures and DATE / RELEASE REF are separate.
THIS INDIVIDUAL WORD OR A COMPLETE SAFETY FILE?
The original editable purchaser-licensed DOCX is ALREADY INCLUDED in the full 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File. Buying either comprehensive set includes this form alongside management and specialist annexures; buyers of the full set need not buy it individually. Explosives, firing and clearance stay under host-mine control.