AP-C02 — VENTILATION SHIFT & AREA READINESS CHECKLIST
AP-C02 is the genuine seven-item shift and area readiness checklist for auxiliary ventilation, mine fans and ducts. It starts with safe isolation and electrical backfeed protection and ends with formal mine ventilation authority release after witnessed airflow tests.
WHEN AND WHERE THIS ORIGINAL IS USED
Use at the start of an approved fan-maintenance shift or before a ventilation-change workface is handed over. Identify MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, including adjacent occupied headings.
SEVEN GENUINE WORKFACE VENTILATION CONTROLS
1. Fan isolation and electrical backfeed checked without compromising adjacent workfaces
2. Temporary airflow routing, stoppings and door settings approved before disturbance
3. Air quality and gas monitoring arranged for occupied affected districts
4. Duct support, flame-retardant materials and leakage testing accepted
5. Loss-of-fan and re-entry protocol communicated to all exposed crews
6. Airflow direction, volume, pressure and alarms recorded after works
7. Mine ventilation authority releases affected workings following measured tests
HOW TO COMPLETE THIS SOURCE RECORD
Tick each actual WORKFACE VERIFICATION / REQUIRED CONTROL item as Y, N or N/A; add EVIDENCE / DEFECT / ACTION for all seven. Check temporary airflow routing, gas monitoring, flame-retardant duct support/leakage, loss-of-fan re-entry communications and measured airflow direction, volume, pressure and alarms.
CRITICAL MINE VENTILATION STOP AND RELEASE
Shift readiness cannot be inherited from old test values. The source HOLD rule applies when mine-authorised clearance, isolation, support conditions, emergency safeguards or critical proof is absent; reassess after changed conditions.
EVIDENCE REVIEW AND OPERATOR SIGN-OFF
The source provides REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, contractor supervisor and host mine authority signatures where required and actual Date / release reference. No checklist overrides the mine plan.
BUY AN EDITABLE SINGLE OR THE COMPLETE MINE COLLECTIONS
This R12.95 original editable AP-C02 Word document already appears in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either complete collection should avoid buying it twice. Current mine ventilation COPs, permits, air and gas criteria and official release remain controlling.
THREE BLUE AVC CROSS-LINKS
Browse AVC original editable checklist Singles