top of page

254 - AP-C02 | Ventilation Shift & Area Readiness Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AP-C02 — VENTILATION SHIFT & AREA READINESS CHECKLIST

AP-C02 is the genuine seven-item shift and area readiness checklist for auxiliary ventilation, mine fans and ducts. It starts with safe isolation and electrical backfeed protection and ends with formal mine ventilation authority release after witnessed airflow tests.

WHEN AND WHERE THIS ORIGINAL IS USED

Use at the start of an approved fan-maintenance shift or before a ventilation-change workface is handed over. Identify MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, including adjacent occupied headings.

SEVEN GENUINE WORKFACE VENTILATION CONTROLS

1. Fan isolation and electrical backfeed checked without compromising adjacent workfaces

2. Temporary airflow routing, stoppings and door settings approved before disturbance

3. Air quality and gas monitoring arranged for occupied affected districts

4. Duct support, flame-retardant materials and leakage testing accepted

5. Loss-of-fan and re-entry protocol communicated to all exposed crews

6. Airflow direction, volume, pressure and alarms recorded after works

7. Mine ventilation authority releases affected workings following measured tests

HOW TO COMPLETE THIS SOURCE RECORD

Tick each actual WORKFACE VERIFICATION / REQUIRED CONTROL item as Y, N or N/A; add EVIDENCE / DEFECT / ACTION for all seven. Check temporary airflow routing, gas monitoring, flame-retardant duct support/leakage, loss-of-fan re-entry communications and measured airflow direction, volume, pressure and alarms.

CRITICAL MINE VENTILATION STOP AND RELEASE

Shift readiness cannot be inherited from old test values. The source HOLD rule applies when mine-authorised clearance, isolation, support conditions, emergency safeguards or critical proof is absent; reassess after changed conditions.

EVIDENCE REVIEW AND OPERATOR SIGN-OFF

The source provides REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, contractor supervisor and host mine authority signatures where required and actual Date / release reference. No checklist overrides the mine plan.

BUY AN EDITABLE SINGLE OR THE COMPLETE MINE COLLECTIONS

This R12.95 original editable AP-C02 Word document already appears in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either complete collection should avoid buying it twice. Current mine ventilation COPs, permits, air and gas criteria and official release remain controlling.

THREE BLUE AVC CROSS-LINKS

Browse AVC original editable checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Mining Contractor H&S File

    bottom of page