253 - AP-C01 | Ventilation Workface Prestart Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AP-C01 — VENTILATION WORKFACE PRESTART CHECKLIST
AP-C01 is the source-original seven-control workface prestart checklist for underground ventilation fans, auxiliary ducting and airflow modifications. It begins with the mine ventilation officer's authorised plan and minimum airflow requirements before any contractor touches the system.
WHEN AND WHERE THIS ORIGINAL IS USED
Complete it before permitted fan servicing, duct installation, stoppings or door work. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR; cite the current authorised ventilation plan, zone and neighbouring workfaces.
SEVEN GENUINE WORKFACE VENTILATION CONTROLS
1. Mine ventilation officer supplies authorised ventilation plan and minimum airflow criteria
2. Fan isolation and electrical backfeed checked without compromising adjacent workfaces
3. Temporary airflow routing, stoppings and door settings approved before disturbance
4. Air quality and gas monitoring arranged for occupied affected districts
5. Duct support, flame-retardant materials and leakage testing accepted
6. Loss-of-fan and re-entry protocol communicated to all exposed crews
7. Airflow direction, volume, pressure and alarms recorded after works
HOW TO COMPLETE THIS SOURCE RECORD
The original table requires Y / N / N/A and EVIDENCE / DEFECT / ACTION for seven printed items. Cover approved criteria, fan backfeed isolation, temporary air routes, gas monitoring, flame-retardant supported ducts, fan-loss/re-entry procedures and measured airflow/alarm evidence.
CRITICAL MINE VENTILATION STOP AND RELEASE
A workface prestart is not a work permit. The source orders HOLD if mine clearance, isolation, emergency safeguards or critical proof is missing, and renewed review after shift or conditions change.
EVIDENCE REVIEW AND OPERATOR SIGN-OFF
The source provides REVIEW / CLOSE-OUT AND EVIDENCE REFERENCES, contractor supervisor and host mine authority signatures where required and actual Date / release reference. No checklist overrides the mine plan.
BUY AN EDITABLE SINGLE OR THE COMPLETE MINE COLLECTIONS
This R12.95 original editable AP-C01 Word document already appears in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either complete collection should avoid buying it twice. Current mine ventilation COPs, permits, air and gas criteria and official release remain controlling.
THREE BLUE AVC CROSS-LINKS
Browse AVC original editable checklist Singles

