top of page

249 - AO-TT02 | Drill Rigs & Blast Hole Operating Handover Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Verify the offer in your cart.

Browse all individual checklist Singles

249 / AO-TT02 — PRODUCTION DRILL OPERATING INTERFACE AND HANDOVER TALK

AO-TT02 is the original editable Word drilling workface operating-interface and handover toolbox talk. Its opening source check verifies that the drill rig's levelling, isolation, mast stability and manufacturer-specific setup have been reviewed before coordinating rig, survey and blasting interfaces.

THE SAFETY RISK THIS ORIGINAL FORM MANAGES

Drill crews, mine surveyors and blast officials may have different information about pad release, drill holes and exclusion boundaries. A rig that appears properly positioned can still be beside an unprotected collar or under a revised lightning warning, while dusty drilling needs continued silica safeguards.

SIX SOURCE-PRINTED CREW BRIEFING SUBJECTS

1. Drill-rig levelling, isolation, mast stability and manufacturer setup validated. 2. Highwall crest setback and flyrock/explosives exclusion communicated to all drill crews. 3. Dust extraction and silica respiratory controls maintained at the rig.

4. Hole collar protection, recorded depth, deviation and water ingress documented for blasting team. 5. Charged holes and exclusion buffers positively marked under mine blasting authority control. 6. Storm/lightning, suspected misfire and blast notification triggers included in STOP criteria.

ACTUAL WORD FIELDS AND MINE AUTHORITY

Complete MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER and use all 16 printed NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE attendance lines. Six printed subjects begin with RIG STABILITY and isolation, then crest restrictions, silica dust capture, blast-hole evidence, positively marked charged buffers and storm/misfire STOP notification criteria. The original is a toolbox talk with attendance, not a new pattern approval.

STOP / WITHDRAW / NOTIFY MINE CONTROL for unstable drill pad, unprotected hole, encroachment near a charged hole or lightning warning. Restart only when the mine-authorised official releases the zone.

EDITABLE SINGLE WORD FORM OR COMPLETE SAFETY FILE?

This identical original editable purchaser-licensed DOCX is ALREADY INCLUDED in the full 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File, along with other specialist forms and management controls. Buyers of either comprehensive collection already receive this document without buying it separately. The mine operator, geotechnical team and blast officer remain the controlling authorities.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page