top of page

248 - AO-TT01 | Service Drilling Without Damaging Ground Support Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-IDENTICAL EDITABLE WORD | R12.95

AO-TT01 — SERVICE DRILLING WITHOUT DAMAGING GROUND SUPPORT TOOLBOX TALK

AO-TT01 is the actual specialist mine contractor toolbox briefing on service drilling without damaging underground ground support. Its five controls include explicit prohibition of penetration through active rock support, pillars, shotcrete or refuge walls without a signed engineering change.

WHERE THIS SPECIFIC UNDERGROUND RECORD APPLIES

Use this original before drilling any service hole, non-production opening, core or anchor penetration in underground workings. Record Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref against current mine instructions.

FIVE ORIGINAL SPECIALIST DRILLING SAFETY CHECKS

1. Mine ground-control/rock engineer has authorised exact position and purpose of drilling.

2. Service scans, mine survey data, geological/void/old working hazards assessed by mine.

3. No penetration of active rock support, pillars, shotcrete or refuge walls without signed engineering change.

4. Gas/flammable atmosphere and approved drill power/air/water arrangements checked.

5. Stop drilling at any unknown support, service, water-bearing seam or damaged reinforcement and seek engineering clearance.

HOW TO COMPLETE THE GENUINE SOURCE WORD FORM

Review the five genuine source items: rock engineer authorisation of exact drilling purpose and position; service scans and old-working/void geology; signed engineering change before crossing active support; gas/flammable atmosphere and drill power/air/water arrangements; and immediate stop at unknown reinforcement, water-bearing seams or struck service. Use the source's recorded briefing format.

DRILLING STOP RULE AND MINE AUTHORITY

The STOP-WORK TRIGGER requires withdrawal for unexpected void/water/gas, struck services, observed support damage, ground movement or absent engineering release. The form does not replace the current risk assessment, permit, induction or statutory competence.

REAL-LIFE EVIDENCE AND COMPETENT APPROVAL

Keep the mine risk assessment, permit and support drawings with the talk; a signature does not authorise work.

ONE WORD SINGLE OR COMPLETE UNDERGROUND MINE COLLECTIONS

This source-identical editable AO-TT01 Word original is R12.95 and already included in the 371-form Underground Mining Checklist Package and full 628-page Contractor H&S File. Existing owners of either containing collection should not buy it twice. Mine geotechnical control, service permits and official handback govern the work.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original editable checklist Singles

Underground Mining Checklist Package — 371 originals

Complete 628-page Underground Contractor H&S File

    bottom of page