top of page

248 - AO-TT01 | Drill Rigs & Blast Hole Critical Hazards Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Verify the offer in your cart.

Browse all individual checklist Singles

248 / AO-TT01 — PRODUCTION DRILL CRITICAL HAZARDS AND CREW ACCOUNTABILITY

AO-TT01 is the original editable one-page Word mine production-drilling critical-hazards and crew-accountability talk. Its FIRST item requires the approved survey pattern and geotechnical drill-pad release, defining the mine's authorised drill locations and workface envelope.

THE SAFETY RISK THIS ORIGINAL FORM MANAGES

The most serious drill-rig exposures may arise where a rig operates near a crest, a hole is left unprotected, or a charged-hole buffer is misread. Add silica dust and mast instability, and an apparently routine drilling shift needs clear responsibility for boundaries and equipment safety.

SIX SOURCE-PRINTED CREW BRIEFING SUBJECTS

1. Approved survey pattern and geotechnical drill-pad release identify hole locations, burden and edge limits. 2. Drill-rig levelling, isolation, mast stability and manufacturer setup validated. 3. Highwall crest setback and flyrock/explosives exclusion communicated to all drill crews.

4. Dust extraction and silica respiratory controls maintained at the rig. 5. Hole collar protection, recorded depth, deviation and water ingress documented for blasting team. 6. Charged holes and exclusion buffers positively marked under mine blasting authority control.

ACTUAL WORD FIELDS AND MINE AUTHORITY

Complete MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER and use all 16 printed NAME / EMPLOYEE OR ACCESS NO. and SIGNATURE attendance lines. The original six points start with the SURVEY PATTERN / PAD RELEASE, then rig setup, crest/flyrock restrictions, silica dust controls, hole records and mine blast authority's charged-hole exclusion. A signature shows briefing attendance; it cannot authorise explosive charging or revise the pattern.

STOP / WITHDRAW / NOTIFY MINE CONTROL for unstable drill pad, unprotected hole, encroachment near a charged hole or lightning warning. Restart only when the mine-authorised official releases the zone.

EDITABLE SINGLE WORD FORM OR COMPLETE SAFETY FILE?

This identical original editable purchaser-licensed DOCX is ALREADY INCLUDED in the full 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File, along with other specialist forms and management controls. Buyers of either comprehensive collection already receive this document without buying it separately. The mine operator, geotechnical team and blast officer remain the controlling authorities.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page