245 - AO-R03 | Drill Rigs & Blast Hole Measured Work Results
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.
Browse all individual checklist Singles
245 / AO-R03 — PRODUCTION DRILL WORK RESULTS AND MEASURED EVIDENCE
AO-R03 is an original one-page editable Word record of measured/assessed production drilling results and actual source evidence, linking approved survey locations, safe rig setup, hole protection and mine-owned charge exclusions. Its FIRST source row is the approved PATTERN REVISION and geotechnical pad release.
WHY THIS REAL PRODUCTION DRILL CONTROL MATTERS
Claims that a drill rig completed its shift do not confirm the stability of its operating pad or show that unprotected collars and hole water ingress were documented. The blast team must receive accurate factual records while silica, highwall setbacks and weather-stop conditions remain controlled.
SEVEN SOURCE-PRINTED MEASUREMENT / EVIDENCE ROWS
1. Approved survey pattern and geotechnical drill-pad release identify hole coordinates, burden and edge limits. 2. Drill-rig levelling, isolation, mast stability and manufacturer setup validated. 3. Highwall crest setback and flyrock/explosives exclusion communicated to drill crew. 4. Dust extraction and silica respiratory protection maintained at the rig.
5. Hole-collar protection, depth, deviation and water ingress documented for the blasting team. 6. Charged holes and exclusion buffers positively marked and controlled by mine blast authority. 7. Storm/lightning, suspected misfire and blast notification triggers included in work-stop criteria.
USE THE ACTUAL WORD FIELDS AND MINE RELEASE
Enter MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Seven original MINING-SPECIFIC ITEM / EVIDENCE TO TRACK rows use DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. Record true pattern, collar, hole log and mine-release IDs without inventing hole spacing, burden values or numerical tolerances; the mine's design remains authoritative.
Use OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF for incomplete evidence; no contractor can self-approve a dangerous blast-hole workface.
The source distinguishes CONTRACTOR SUPERVISOR / SIGNATURE from MINE RELEASE AUTHORITY / SIGNATURE and DATE / RELEASE REF. A contractor's observations do not overrule the mine operator's blast officer, geotechnical permits, charged-hole exclusion or TARP.
ONE ORIGINAL WORD FORM OR THE COMPLETE MINE COLLECTION?
The identical editable purchaser-licensed original DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and the full Surface Mining Contractor H&S File with other trade-specific controls and site management materials. Customers who purchase the larger set already receive this record. Always work under the mine's current drill/blast permissions.

