top of page

244 - AO-R02 | Drilling Defect Inspection & Corrective Action Log

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AO-R02 — DRILLING DEFECT INSPECTION & CORRECTIVE ACTION LOG

AO-R02 is the authentic open-entry defect, inspection and corrective-action log for underground drilling, coring and non-production openings. Unlike the seven-item AO-R03, this source does NOT contain predefined numbered safety rows: it provides five operational table fields for the actual defects arising on the awarded work.

WHERE AND WHEN TO USE THIS MINE RECORD

Use it whenever a drilled penetration, service scan, rig, hole reinstatement, damaged support or drilling authorisation needs recorded correction. Complete Underground mine / site, Company, Contract / work order and Responsible person using the real project identifiers.

FIVE PRINTED RECORD COLUMN HEADINGS

ITEM / LOCATION

DEFECT / CONTROL

OWNER / TARGET

ACTION / EVIDENCE

ACCEPTED / CLOSED

HOW TO COMPLETE THE REAL WORD SOURCE

The source's five actual table headings are ITEM / LOCATION, DEFECT / CONTROL, OWNER / TARGET, ACTION / EVIDENCE and ACCEPTED / CLOSED. Create factual rows from the observed defects, reference photographs, inspection records and technical certificates, assign a responsible person and due target, then retain formal acceptance evidence.

IMPORTANT SAFETY AND AUTHORISATION RESTRICTIONS

The printed CONTROL clause requires the register to be updated as scope, authorisations, equipment, workers, hazards or mine requirements change. Incomplete entries must be closed before affected work proceeds; keep high-consequence work stopped until accepted.

SOURCE EVIDENCE AND RESPONSIBLE REVIEW

This is an open-entry register: add only observed or checked facts under the real printed columns. Its design does not pre-certify the work, approve bore positions or generate permissions.

WORD SINGLE OR COMPLETE UNDERGROUND COLLECTIONS

This R12.95 original Word AO-R02 is already within the 371-form Underground Mining Checklist Package and 628-page Contractor H&S File. Owners of either need not buy it twice. Mine drilling permits, engineering drawings and official approvals remain essential.

THREE BLUE AVC PRODUCT CROSS-LINKS

Browse AVC original editable checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Contractor H&S File

    bottom of page