243 - AO-R01 | Drill Rigs & Blast Hole Competence, Permits & Plant
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check your cart.
Browse all individual checklist Singles
243 / AO-R01 — PRODUCTION DRILL COMPETENCE, PERMITS AND PLANT EVIDENCE
AO-R01 is the original one-page editable Word mine drilling competence, work permits and plant-identification evidence register. It connects the named work order and drill rig crew to seven site-controlled pad, equipment, exposure and blast-hole authorisations.
WHY ACTUAL MINE DRILL EVIDENCE MATTERS
Operator experience cannot override geotechnical pad release, crest restrictions, charged-hole markings or changed storm warnings. Each permission and plant identity must match the actual authorised pattern and the mine's current blasting interface.
SEVEN ORIGINAL SOURCE EVIDENCE ITEMS
1. Approved survey pattern and geotechnical drill-pad release show hole coordinates, burden and edge limits. 2. Drill-rig levelling, isolation, mast stability and manufacturer setup validated. 3. Highwall crest setback and flyrock/explosives exclusion communicated to drill crew. 4. Dust extraction and silica respiratory controls maintained at the rig.
5. Hole collar protection, depth, deviation and water ingress documented for the blasting team. 6. Charged holes and exclusion buffers marked under mine blasting authority. 7. Storm/lightning, suspected misfire and blast notification included in work-stop criteria.
SOURCE WORD FIELDS AND MINE APPROVAL
Enter MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. The seven original rows start with SURVEY PATTERN / PAD RELEASE, then rig setup, highwall exclusion, dust protection, collar record, mine-controlled charged buffers and STOP notifications. The source provides DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS, not invented certificate/serial columns.
Each printed MINING-SPECIFIC ITEM / EVIDENCE TO TRACK has DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. Record actual assessed or measured proof; an unverified control remains open under OUTSTANDING DEFECT / NCR / REINSPECTION / RETENTION FILE REF.
CONTRACTOR SUPERVISOR / SIGNATURE and MINE RELEASE AUTHORITY / SIGNATURE plus DATE / RELEASE REF are separate. Only the mine's authorised official can release the affected work zone. Contractors cannot approve charged-hole boundaries or explosives activity.
BUY A SINGLE WORD OR THE COMPLETE MINE FILE?
This same source-identical editable purchaser-licensed DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and the full Surface Mining Contractor H&S File alongside site management and specialist trade controls. A buyer of either comprehensive set need not buy this form separately.

