top of page

242 - AO-H02 | Drilling Witness Hold & Mine Return-to-Service Gate

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AO-H02 — DRILLING WITNESS HOLD & MINE RETURN-TO-SERVICE GATE

AO-H02 is the source-original five-gate witnessed hold and mine return-to-service form for service drilling, anchor drilling and small non-production penetrations. Its first gate is rock-engineer approval of exact bore geometry, followed by service detection and geological risk checks.

WHERE AND WHEN TO USE THIS MINE RECORD

Use it before the mine accepts a critical drilling phase or returns an opened zone to operation. Complete MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, citing the current rock-engineering instruction and affected work area.

FIVE ACTUAL OPERATOR-OWNED WITNESS HOLD GATES

1. Rock engineering authorises exact location, depth and orientation

2. Service drawings and available scans checked for buried and overhead services

3. Old workings, unexpected voids and groundwater pressure examined before penetration

4. Ground support, shotcrete, mesh and pillar loads protected

5. Dust/water/gas suppression and respiratory controls appropriate to geology

HOW TO COMPLETE THE REAL WORD SOURCE

In five genuine HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS cells, capture engineer-authorised position/depth/orientation, scans for services, old working/void/groundwater reviews, preserved mesh/shotcrete/pillars and geology-appropriate dust, gas and respiratory protection.

IMPORTANT SAFETY AND AUTHORISATION RESTRICTIONS

All applicable holds must PASS, evidence must trace to the approved mine work order and defect corrections must be witnessed. Operator-owned release is by named mine authority only; the contractor's signed record is not work or occupancy permission.

SOURCE EVIDENCE AND RESPONSIBLE REVIEW

The source provides operator-owned RELEASE CONDITION, witnessed correction and mine supervisor/host signatures where required and Date / release reference.

WORD SINGLE OR COMPLETE UNDERGROUND COLLECTIONS

This R12.95 original Word AO-H02 is already within the 371-form Underground Mining Checklist Package and 628-page Contractor H&S File. Owners of either need not buy it twice. Mine drilling permits, engineering drawings and official approvals remain essential.

THREE BLUE AVC PRODUCT CROSS-LINKS

Browse AVC original editable checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Contractor H&S File

    bottom of page