top of page

241 - AO-F01 | Drill Rigs & Blast Hole Technical Hold and Release

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart offer.

Browse all individual checklist Singles

241 / AO-F01 — PRODUCTION DRILL RIG TECHNICAL HOLD AND WORK RELEASE

AO-F01 is the original five-gate editable Word mine technical HOLD and authorised work release form for production drilling, blast-hole records and unstable drill-pad interfaces. Its first gate is the mine-approved survey pattern and geotechnical pad release.

WHY THIS DRILL WORKFACE CONTROL MATTERS

A rig may be stable and drilling equipment ready while the crest offset, charged-hole exposure or an unprotected collar makes the work zone unsafe. The correct release decision must consider authorised hole positions, stable rig setup, silica controls and recorded hole conditions rather than a contractor's visual all-clear.

FIVE REAL HOLD AND WITNESS GATES

1. Approved survey pattern/geotechnical pad release show authorised hole locations, burden and edge limits. 2. Drill-rig levelling, isolation, mast stability and manufacturer setup validated. 3. Highwall crest setback and mine flyrock/explosives exclusion briefed to drill crew.

4. Dust extraction and silica respiratory protection maintained at production rig. 5. Hole collar protection, depth, deviation and water ingress documented for blast team.

REAL SOURCE FIELDS, DEFECTS AND MINE RELEASE

The FIVE printed HOLD TRIGGER / EVIDENCE GATE rows use REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS. The source begins with pattern and pad permission, then rig levelling, highwall/flyrock boundary, respiratory protection and hole collar data. There is no seventh drilling or blast-setting row.

After all five gates, defects and witness records are verified, only the designated mine authority may record RELEASE.

Complete MINE / PIT / WORK AREA, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR. Contractor and MINE RELEASE AUTHORITY / SIGNATURE with DATE / RELEASE REF are separate; no self-approved drilling or blasting permission.

BUY THIS SINGLE OR THE COMPLETE MINE SAFETY SYSTEM?

This identical original editable purchaser-licensed Word DOCX is ALREADY INCLUDED in the full 386-document Surface Mining Checklist Package and complete Surface Mining Contractor H&S File. The larger set brings all these specialised forms with wider contractor management controls, without requiring a separate purchase of this Single. The mine blast officer retains control of charged-hole areas and authorisations.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page