top of page

24 - AB-C19 | Underground Ground & Seismic Change Verification

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AB-C19 — UNDERGROUND GROUND & SEISMIC CHANGE VERIFICATION

Source-original underground mine workpack AB-C19: 7 authentic printed WORKFACE VERIFICATION / REQUIRED CONTROL items are reproduced below, not replaced by generic or invented content. Actual mine operator restrictions, permits and acceptance apply.

THE MINE TASK AND SOURCE DOCUMENT

Use for Underground Ground & Seismic Change Verification under the current host-mine COP/SOP, applicable work order, authorised mine level/zone, shift and crew. The original requires date, supervisor and site-specific approval details and does not itself issue permission to perform work.

7 GENUINE SOURCE WORKFACE VERIFICATION POINTS

1. Rock engineering releases support and ground classification

2. Visible scaling/barring defects and new cracks checked

3. Blast and seismic exclusion windows confirmed

4. Support interference or anchor drilling controlled

5. Changed water, ventilation or machine loading recorded

6. Evacuation/escalation threshold briefed

7. Area re-entry release current

RECORD YOUR ACTUAL WORD EVIDENCE

Mark each original control Y/N/N/A and enter EVIDENCE / DEFECT / ACTION. Explain NO/N/A findings, refer to site procedures and record evidence before requesting mine acceptance.

MINE STOP-WORK AND OPERATOR AUTHORITY

STOP or HOLD whenever current mine access clearance, isolation, life-safety support, emergency readiness, technical acceptance or required verification is absent. Do not use this source Word checklist as a substitute for a mine-owned permit, engineering design or operator release.

ACTUAL WORK ORDER AND TECHNICAL CLOSE-OUT

Retain the affected mine zone and equipment, responsible mine official, current applicable procedure revision, real measurements and observations, identified deficiencies, correction ownership, independent reinspection and signed operator release evidence with the source file. Reassess after changes in task, shift, crew, equipment, mine conditions or emergency arrangements.

SINGLE WORD ORIGINAL OR FULL MINE COLLECTION

This R12.95 AB-C19 original Word is also in the full 371-document Underground Mining Checklist Package and 628-page Contractor H&S File. Existing package owners should avoid duplicate purchases. The host mine remains responsible for mine-level work authority and accepted releases.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Full 628-page Underground Mining H&S File

    bottom of page