top of page

24 - AB-C19 | Drill Rig Pad, Blast Holes and Explosive Hazard

R 12,95Price

Buy 4 Checklists, Get 1 Free

OPENCAST MINING SINGLES OFFER: Each original editable Microsoft Word form costs R12.95. For eligible Singles, add five and pay for four, ten for eight or fifteen for twelve while the cart promotion applies.

AB-C19 — DRILL RIG PAD, BLAST HOLES AND EXPLOSIVE HAZARD

You've won work at an operational surface mine. Drill Rig Pad, Blast Holes and Explosive Hazard requires real mine-site checks and authorised decisions, not a template borrowed from another trade. AVC developed this original Section AB contractor form to connect the awarded job, its risk controls and evidence to the mine official who owns work release.

SEVEN ORIGINAL YES/NO/N/A WORKFACE CHECKS

1. Rig pad and crest offset released for equipment size.

2. Hole pattern and drill route align with survey revision.

3. Drilling guards, emergency stop and dust capture functional.

4. Open/charged holes and restricted areas demarcated.

5. Blast authority schedule and radio communications current.

6. Lightning and weather shutdown triggers briefed.

7. Hole handover and custody assigned to authorised mine party.

EXACT WORD RECORD FIELDS AND EVIDENCE

This original is a 7-row mine contractor checklist. Each printed RELEASE / VERIFICATION POINT uses YES, NO, N/A and EVIDENCE / ACTION. Explain N/A, retain open NO items and document the actual evidence.

The source provides Mine / site, Contractor / company, Area / zone, Date / shift, Work order / activity and Supervisor. Separate CONTRACTOR CHECK and MINE / HOST RELEASE signatures record the actual DATE / REFERENCE. This does not create permission by itself.

STOP / HOLD — ONLY COMPETENT MINE RELEASE COUNTS

The printed RELEASE RULE requires stop, escalation, documented correction and new release for every NO against a critical risk. A contractor's tick cannot override the mine's operating rules, mine permits or competent work-release decisions.

PREPARE THE WORD ORIGINAL FOR YOUR CONTRACT

Insert your business and mine particulars, actual zone, date/shift, permit, worker details and responsible signatories. Follow the source order; attach real work-package, test, inspection, map or competent verification references as appropriate. Recheck changed operating conditions before the workface is handed over.

ONE R12.95 SINGLE OR THE COMPLETE CONTRACTOR SYSTEM?

This exact editable AB-C19 original is ALREADY INCLUDED inside AVC's 386-document Surface, Opencast & Quarry Mining Checklist Package AND within the complete Surface Mining Contractor Health & Safety File. Don't buy it again if you own either larger product. The complete file additionally includes the professional contractor-management foundation.

Browse all AVC Safety Checklist Singles.

Compare the full 386-document Surface Mining Checklist Package.

See the complete Surface Mining Contractor Health & Safety File.

This source is supporting contractor evidence only, not statutory mine accreditation, mine approval, a blasting permission, equipment restart authority or a substitute for the current mine COP/SOP and issued permits.

    bottom of page