top of page

238 - AO-C01 | Drilling Task Readiness & Prestart Checklist

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-IDENTICAL EDITABLE WORD | R12.95

AO-C01 — DRILLING TASK READINESS & PRESTART CHECKLIST

AO-C01 is the actual TEN-point drilling, coring and non-production opening prestart. Unlike seven-point checklists, it covers water-inrush preparedness, rig entanglement, sealing before concealment and mine survey reinstatement.

WHERE AND WHEN THIS ORIGINAL APPLIES

Complete against live mine permits and rock engineering rules. Identify Underground mine / site, Contractor / company, Area / zone, Date / shift, Work order / activity and Supervisor; state N/A reasons.

TEN ORIGINAL DRILLING PRESTART POINTS

1. Mine ground-control/rock engineer has authorised exact position and purpose of drilling.

2. Service scans, mine survey data, geological/void/old working hazards assessed by mine.

3. No penetration of active rock support, pillars, shotcrete or refuge walls without signed engineering change.

4. Gas/flammable atmosphere and approved drill power/air/water arrangements checked.

5. Drill/coring dust suppression compatible with mine ventilation and electrical safety.

6. Water inrush, pressurised void, mud and slurry control plan accepted.

7. Equipment anchored and restrained; rotating drill steel/entanglement hazard controlled.

8. Noise/vibration/dropped objects and nearby personnel exclusion established.

9. Core/opening inspected before concealment with required fire, gas and water sealing.

10. Mine survey/engineering acceptance and services reinstatement complete before handback.

HOW TO COMPLETE THE ACTUAL SOURCE RECORD

Use genuine ten RELEASE / VERIFICATION POINT rows with YES, NO, N/A and EVIDENCE / ACTION. Verify engineer-approved purpose, survey scans, signed support changes, gas/power/air/water, dust suppression, inrush/slurry plan, restrained rotating drills, noise/drop exclusion, fire/gas/water penetration sealing and final survey/engineering acceptance.

MINE SAFETY AND AUTHORISED RELEASE

The original RELEASE RULE requires all applicable high-risk and operator-owned holds released before work starts. Separate CONTRACTOR CHECK and MINE / HOST RELEASE signatures and date/reference are compulsory where applicable.

EDITABLE SINGLE OR COMPLETE UNDERGROUND FILE

This editable original AO-C01 Word record is R12.95 and already appears in the 371-form Underground Mining Checklist Package and full 628-page Contractor H&S File. Owners of either containing product should not buy it twice. Actual mine engineering permits and host-mine release remain controlling.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original editable checklist Singles

371-original Underground Mining Checklist Package

Complete 628-page Underground Contractor H&S File