top of page

233 - AN-TT01 | Conveyor Stored Energy and Surprise Start-Up Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying Singles: five for four, ten for eight or fifteen for twelve. Check the cart offer.

Browse all checklist Singles

233 / AN-TT01 — CONVEYOR STORED ENERGY AND SURPRISE START-UP

AN-TT01 is the original editable Word five-point toolbox/pre-start briefing about conveyor stored energy and surprise restart, rather than a generic conveyor operations guide. The mine operations owner is responsible for defining every energy source in the controlled machine envelope.

WHY THIS PROCESSING-PLANT CONTROL IS CRITICAL

A stopped conveyor can restart remotely or move because of gravitational feed, accumulator energy or tensioned belt take-up equipment. A worker at a nip point or bridged hopper may have no practical escape when such energy is released. The source keeps local and remote control with the authorised isolation owner.

5 ACTUAL SOURCE CONTROL POINTS

1. Mine operations owner identifies mechanical, electric, gravity and stored feed energy. 2. Mine host LOTO includes back feed, belt tension, accumulators and automatic start sources. 3. Control rotating shafts, conveyor nip points and removed guards.

4. Assess bridging, engulfment and falls around hoppers and chutes. 5. Keep local and remote start signals controlled by isolation owner until guards restored.

WHAT THE EDITABLE ORIGINAL WORD DOCUMENT CONTAINS

Exactly FIVE printed topics, plus mine/area, date/shift, work order/task, contractor, presenter and risk assessment references with NAME / STAFF NO. and SIGNATURE fields. It is a crew briefing, not a full site LOTO proof sheet or an operator-owned restart certificate.

STOP / WITHDRAW / NOTIFY MINE CONTROL for material bridging or engulfment, suspended counterweight, unguarded nip points, unverified isolation or uncontrolled startup. The current mine COP/SOP, permits, risk assessment and authorised operating-area release always prevail; this form is not self-authorisation.

SINGLE CHECKLIST OR COMPLETE SURFACE MINING PACKAGE?

This identical original editable purchaser-licensed Word DOCX is ALREADY INCLUDED within the 386-document Surface Mining Checklist Package and also the complete Surface Mining Contractor Health and Safety File. Customers buying either complete collection already receive this exact checklist with other specialist mine controls. No separate Single purchase is needed for those buyers.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page