232 - AN-T01 | Communication & Automation Inspection and Test Record
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AN-T01 — COMMUNICATION & AUTOMATION INSPECTION AND TEST RECORD
AN-T01 is the authentic seven-row technical inspection and test record for underground communications, monitoring and automation. It captures critical service maps, controlled configuration changes, alarm redundancy, gas/ventilation/escape interfaces, SCADA integrity and mine control-room acceptance.
WHEN TO USE THIS UNDERGROUND ORIGINAL
Use it before a serviced mine network, automated system or alarm is handed back. Identify Underground mine / site, Contractor, Item / system / asset ID, Work order, Drawing / revision and Activity date with the responsible receiving mine official.
SEVEN ACTUAL MINE COMMUNICATION INSPECTION ITEMS
1. Critical service map and approved change plan
2. OT permission and device/software version control
3. Critical alarm/communications redundancy tests
4. Gas/ventilation/escape interface authorisation
5. Network/SCADA alarms/trips/integrity tests
6. Roll-back and temporary-bypass closure
7. Mine control room/engineering handover
HOW TO COMPLETE THIS ORIGINAL WORD RECORD
Complete the original TEST / COMPLETION RECORD, RESULT / MEASUREMENT and SOURCE / SIGN-OFF columns for all seven items. Cite approved change maps, device/software versions, emergency alarm test results, gas/escape interface acceptance, network/SCADA alarms and trips, rollback closure and mine handover.
CRITICAL STOP-WORK AND MINE RELEASE
Blank spaces are not completion evidence. Attach test sheets, calibration certificates and inspections as needed; disclose defective or restricted items and do not return the affected system to service without operator-approved close-out.
CONTROLLED WORD SINGLE AND COMPLETE FILE OPTIONS
The source-identical editable AN-T01 Word file costs R12.95 and is included in the 371-form Underground Mining Checklist Package and 628-page Contractor H&S File. Owners of either collection should not buy it twice. Mine-issued OT permits, emergency communications plans, competent change approvals and formal mine release always govern use.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

