top of page

226 - AN-F01 | Communication Hold, Release & Handover Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD R12.95

AN-F01 — COMMUNICATION HOLD, RELEASE & HANDOVER RECORD

AN-F01 is the original five-stage hold, release and handover record for underground communication, personnel tracking and automation work. It links critical change approval, emergency call continuity, controlled isolation, functional alarms and official mine acceptance.

WHERE TO USE THE ORIGINAL

Use it before progressing a critical underground OT or SCADA work stage. Record Underground mine / site, Company, Area / equipment, Permit / work order, Supervisor and Host-mine work owner with approved change references.

FIVE ACTUAL MINE HOLD STEPS

1. Operational technology change and critical-system impact approval

2. Emergency communications/tracking continuity safeguard

3. Permitted equipment, isolation and ground-safe cable installation

4. Functional alarm, interlock, tracking and SCADA tests

5. Control-room and mine safety-system return-to-service acceptance

COMPLETING THE PRINTED SOURCE FIELDS

For each of five genuine STEP / HOLD / STOP POINT items, mark Hold, Release or N/A, with evidence, time and verifier signature. Refer to emergency tracking safeguards, mine-rated cables, authorised isolation, interlock and alarm test results and final control-room acceptance.

CRITICAL MINE CONTROL AND RETURN-TO-SERVICE RULE

NO RELEASE IF a technical or witnessed hold, required permit or operator acceptance is missing. FINAL CONTRACTOR ACCEPTANCE and HOST-MINE RELEASE are separate original signature fields; only the mine official clears affected workings.

ORIGINAL WORD SINGLE OR COMPLETE UNDERGROUND COLLECTIONS

This original editable AN-F01 Word source costs R12.95 and is included in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you already own either containing product, do not buy a duplicate. Use the current mine emergency communications criteria, OT approvals, operator-controlled change plan and valid permits.

THREE BLUE AVC LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Complete 628-page Contractor Health & Safety File

    bottom of page