AN-C01 — COMMUNICATION & AUTOMATION TEN-POINT PRESTART CHECKLIST
AN-C01 is the authentic TEN-point underground communications, tracking, SCADA and monitoring prestart. It includes critical emergency calling, secure OT access, backup communications, safe cable routing, remote command safeguards and time-limited bypass control.
WHERE TO USE THE ORIGINAL
Before work starts, enter Underground mine / site, Contractor / company, Area / zone, Date / shift, Work order / activity and Supervisor. Use the host's current mine-approved change and permit; explain every N/A.
TEN ORIGINAL MINE PRESTART ITEMS
1. Mine digital/control room owner has accepted change request and criticality/rollback plan.
2. Critical emergency calls, refuge communications, alarms and tracking systems mapped before isolation.
3. Underground mine gas/flammable zone equipment certification and cable routing confirmed.
4. Power/network isolation and cyber/OT access rights controlled by mine policy.
5. Redundant emergency communication system established before planned outages.
6. Cables installed without weakening ground support, blocking refuge or impairing ventilation.
7. Remote machine commands, alarms and SCADA thresholds protected against unexpected activation.
8. Integration tests, operator training and event logs retained against controlled versions.
9. Temporary bypasses/interlock overrides authorised and time limited by competent mine authority.
10. Incident notification, rollback and critical monitoring handback signed by mine owner.
COMPLETING THE PRINTED SOURCE FIELDS
Complete the ten source RELEASE / VERIFICATION POINT entries with YES, NO, N/A and EVIDENCE / ACTION. Retain the real digital-owner approval, tracking map, gas-rated equipment, isolation, redundant emergency calls, refuge-safe cable route, SCADA thresholds, test logs, bypass expiry and mine-owner rollback acceptance.
CRITICAL MINE CONTROL AND RETURN-TO-SERVICE RULE
The RELEASE RULE requires all high-risk operator holds cleared before starting. CONTRACTOR CHECK and MINE / HOST RELEASE are distinct fields. No bypass or network intervention overrides mine-issued work permission.
ORIGINAL WORD SINGLE OR COMPLETE UNDERGROUND COLLECTIONS
This original editable AN-C01 Word source costs R12.95 and is included in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. If you already own either containing product, do not buy a duplicate. Use the current mine emergency communications criteria, OT approvals, operator-controlled change plan and valid permits.
THREE BLUE AVC LINKS
Browse AVC original checklist Singles