top of page

223 - AN-C01 | Crusher Conveyor Task Readiness and Pre-Start

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check the cart offer.

Browse all checklist Singles

223 / AN-C01 — CRUSHER CONVEYOR TASK READINESS AND TEN-POINT PRE-START

AN-C01 is the original editable TEN-POINT crusher and conveyor task-readiness/pre-start Word checklist for surface-mine mineral processing maintenance. It covers the full work chain from stored-energy owner approval and confined-area risk to safeguards, trial testing and mine-controlled commissioning.

WHY TEN INDEPENDENT MINE READINESS CHECKS MATTER

Even after an electrical lockout, belt tension, hydraulics or trapped aggregate can expose workers. Crushers also create fall zones, heavy suspended components, silica and fire/noise exposures. The ten real source checks prevent a maintenance activity from being mistaken for automatically authorised plant recommissioning.

ALL TEN PRINTED PRE-START VERIFICATION POINTS

1. Operations owner identifies mechanical, electric, gravity and stored feed energy. 2. Mine lockout includes back-feed, belt tension, accumulators and auto-start sources. 3. Control moving plant, belt nip points, shafts and removed guarding. 4. Assess bridging/engulfment and falls in chutes and hoppers. 5. Confined-space permit and rescue arrangement where required.

6. Control elevated access, pits/voids and dropped-object zones. 7. Assess silica/dust, noise and fire or explosion risk. 8. Safe lifting, rigging and support of crusher components. 9. Guards, interlocks and emergency pull-wires checked before service. 10. Operations-owned commissioning, jog/run tests and ramp-up approved.

EXACT YES/NO/N-A FIELDS AND MINE SIGNOFF

The actual source presents TEN RELEASE / VERIFICATION POINTS, YES, NO, N/A and EVIDENCE / ACTION, not seven measurements. It records Mine/site, Area/zone, Work order/activity, Contractor/company, Date/shift and Supervisor. N/A requires written evidence; a critical failed item must be referred to the responsible mine official.

Its printed RELEASE RULE requires all applicable high-risk and operator-owned hold points to be closed before start. CONTRACTOR CHECK and MINE / HOST RELEASE each have signature fields and DATE / REFERENCE. The source does not grant a confined-space entry permit or authorise a test jog by itself.

ONE ORIGINAL WORD OR COMPLETE MINING SYSTEM?

This identical source original purchaser-licensed editable Word DOCX is ALREADY INCLUDED in the complete 386-document Surface Mining Checklist Package and in the Surface Mining Contractor Health and Safety File. Buying either comprehensive set includes this original pre-start form alongside mine operating controls, permits, emergency and many other specialist annexures; customers need not purchase it separately.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page