223 - AM-C05 | Airport Radio & NAVAID Shift Restart Readiness
Buy 4 Checklists, Get 1 Free
SOURCE-ORIGINAL PURPOSE
This AVC source-original aviation workfront verification checklist is for airport radio & navaid shift restart readiness. Changed aircraft movements and shifts require renewed service-outage and specialist escort checks. It is designed for an actual approved airport work package rather than generic construction compliance.
WHEN AND HOW TO USE IT
Record the actual AIRPORT/AREA or WORK ZONE, asset, permit/work order and shift/date wherever those fields appear on the source. Verify the competent specialist, airport custodian, access arrangements and current operating window before proceeding. Stop after changes to flight operations, radio/meteorological equipment or the permitted system condition.
THE AUTHENTIC PRINTED POINTS
The original Word prints 8 numbered checks or hold gates: 1. Confirm operating aircraft / passenger / airline movements and the approved work window. 2. Changed weather, visibility, wind, electrical state or aircraft stand usage assessed. 3. Current escort, radio, driver, access and safety permits confirmed for this shift. 4. Subcontractor workfront limits, barriers and emergency exit paths rebriefed. 5. unsafe service outage — verify controls remain valid after changed conditions. 6. outage window — authority and evidence rechecked. 7. Any changed task or temporary bypass has a revised method, risk review and approval. 8. Shift-end personnel, vehicle, equipment, FOD and open holds are reconciled.
EVIDENCE AND SIGNATURES
The source expects real YES/NO/N/A or HOLD evidence as applicable, with reviewer, unresolved defect, corrective action and airport release reference. Leave failed checks open until a competent authority decides.
SYSTEM OWNER AND AIRPORT RELEASE
Aviation communications, navigation aids and weather-monitoring equipment can be flight-critical. The correct airport/aviation systems authority controls RF energy, safe access, outages, independent calibration or tests and return to service. Contractor completion is not equivalent to an operator's release.
ORIGINAL WORD AND AVC FILE OPTIONS
Buy this exact editable AVC original Word DOCX for R12.95 individually, or find the identical document already included in the 420-document Airports & Airside Checklist Package and the full 659-page Airports Contractor H&S File. Avoid duplicate buying. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the automatic cart offer applies (5 pay for 4, 10 for 8, 15 for 12); confirm at checkout. Packages are excluded. Airport work permits and system release remain separate.