top of page

220 - AM-TT03 | Conveyor Shift Change & Stored Material Hazards Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — EDITABLE SOURCE-IDENTICAL WORD | R12.95

AM-TT03 — CONVEYOR SHIFT CHANGE & STORED MATERIAL HAZARDS TALK

AM-TT03 is the source-original six-item underground conveyor and chute shift-change briefing. It begins with independent isolation of electrical drive, hydraulic force and gravity material, then covers unstable hang-ups before examining trips, smoke risks, guarding and chute-entry restrictions.

WHERE THE ORIGINAL MINE DOCUMENT APPLIES

Use it during shift handover, changed mine operating conditions or before a new team continues belt, chute, loading or transfer-station maintenance. Enter MINE / AREA / DATE / SHIFT and PERMIT / PRESENTER, naming the mine responsible conveyor owner and the isolation or change permit.

SIX ORIGINAL UNDERGROUND CONVEYOR BRIEFING CONTROLS

1. Belt drive, gravity material and hydraulic energy isolated independently

2. Material hang-ups assessed for uncontrolled release and stored potential energy

3. Pull-wire, belt slip, misalignment, fire detection and start-warning circuits controlled

4. Underground dust, fire and ventilation interactions reviewed

5. Skirt, guarding and walkway access maintained during work

6. No entry into chute, crusher or ore pass before mine-approved secure-empty checks

HOW TO COMPLETE THE SOURCE WORD RECORD

Use the six real printed briefing points; discuss counterweights, material bridges, fire warning and blocked ventilated headings. Match briefing attendance against the original 16 name/employee/access-number signature lines; verify which systems remain isolated across shifts.

CRITICAL STOP, WITHDRAW AND RESTART RESTRICTIONS

A previous shift's isolation note cannot authorise a restart. The mine must confirm secured materials, functional pull wires, access and final release. Moving belts, unstable ore or an unapproved remote start demand immediate withdrawal and mine-control notification.

BUY THE SINGLE OR THE FULL UNDERGROUND COLLECTION

This R12.95 original editable AM-TT03 Word record is already included in the 371-original Underground Mining Checklist Package and the complete 628-page Contractor H&S File. Owners of either containing collection need not buy the same original again. Actual mine permits, competent isolation, controlled chute access, fire safety and authorised production release govern use.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

Underground Mining Checklist Package — 371 originals

Complete 628-page Underground Contractor Safety File

    bottom of page