22 - AB-C17 | Haul Road and Roadwork Interface Pre-Start
Buy 4 Checklists, Get 1 Free
OPENCAST MINING SINGLES OFFER: Each original editable Microsoft Word form costs R12.95. For eligible Singles, add five and pay for four, ten for eight or fifteen for twelve while the cart promotion applies.
AB-C17 — HAUL ROAD AND ROADWORK INTERFACE PRE-START
You've won work at an operational surface mine. Haul Road and Roadwork Interface Pre-Start requires real mine-site checks and authorised decisions, not a template borrowed from another trade. AVC developed this original Section AB contractor form to connect the awarded job, its risk controls and evidence to the mine official who owns work release.
SEVEN ORIGINAL YES/NO/N/A WORKFACE CHECKS
1. Active heavy fleet envelope and mine road classification confirmed.
2. Temporary route approval, sight lines and signage verified.
3. Berms, gradients and pavement bearing condition checked.
4. Traffic separation, escorts and spotters appointed.
5. Dust suppression and low visibility trigger controls briefed.
6. Emergency vehicle access remains available.
7. Dispatcher approves opening and revokes when changed.
EXACT WORD RECORD FIELDS AND EVIDENCE
This original is a 7-row mine contractor checklist. Each printed RELEASE / VERIFICATION POINT uses YES, NO, N/A and EVIDENCE / ACTION. Explain N/A, retain open NO items and document the actual evidence.
The source provides Mine / site, Contractor / company, Area / zone, Date / shift, Work order / activity and Supervisor. Separate CONTRACTOR CHECK and MINE / HOST RELEASE signatures record the actual DATE / REFERENCE. This does not create permission by itself.
STOP / HOLD — ONLY COMPETENT MINE RELEASE COUNTS
The printed RELEASE RULE requires stop, escalation, documented correction and new release for every NO against a critical risk. A contractor's tick cannot override the mine's operating rules, mine permits or competent work-release decisions.
PREPARE THE WORD ORIGINAL FOR YOUR CONTRACT
Insert your business and mine particulars, actual zone, date/shift, permit, worker details and responsible signatories. Follow the source order; attach real work-package, test, inspection, map or competent verification references as appropriate. Recheck changed operating conditions before the workface is handed over.
ONE R12.95 SINGLE OR THE COMPLETE CONTRACTOR SYSTEM?
This exact editable AB-C17 original is ALREADY INCLUDED inside AVC's 386-document Surface, Opencast & Quarry Mining Checklist Package AND within the complete Surface Mining Contractor Health & Safety File. Don't buy it again if you own either larger product. The complete file additionally includes the professional contractor-management foundation.
Browse all AVC Safety Checklist Singles.
Compare the full 386-document Surface Mining Checklist Package.
See the complete Surface Mining Contractor Health & Safety File.
This source is supporting contractor evidence only, not statutory mine accreditation, mine approval, a blasting permission, equipment restart authority or a substitute for the current mine COP/SOP and issued permits.

