top of page

219 - AM-TT02 | Conveyor Automatic Starting & Chute Hang-Up Toolbox Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — EDITABLE SOURCE-IDENTICAL WORD | R12.95

AM-TT02 — CONVEYOR AUTOMATIC STARTING & CHUTE HANG-UP TOOLBOX TALK

AM-TT02 is the actual FIVE-point conveyor automatic-start and chute hang-up toolbox talk. It tackles remote start hazards, guarded loading zones, trapped material and the separate permits required for potentially engulfing chute or bin entries.

WHERE THE ORIGINAL MINE DOCUMENT APPLIES

Use it at the approved underground conveyor and transfer-point workface before clearing a hang-up, maintaining chute skirts, inspecting a belt drive or restoring start signals. Record Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref.

FIVE SOURCE-ORIGINAL SPECIALIST TOOLBOX POINTS

1. Conveyor guarding, pull wires, pre-start alarms and emergency stops reinstated.

2. Transfer point ventilation/dust/gas monitoring and combustible accumulation controlled.

3. Confined chute/bin entry requires separate host authority and prepared rescue.

4. Headroom, void, access and traffic barriers provided at belt drive and loading area.

5. Inspect all clearing points for personnel and tools and obtain the authorised controlled restart release.

HOW TO COMPLETE THE SOURCE WORD RECORD

Discuss exactly five printed items: guard/pull-wire/prestart alarm restoration; ventilation/dust/gas monitoring; separate host-mine authority and rescue for confined chute or bin entry; headroom/void, access and traffic barriers; and tool/person clearance before witnessed restart. Fill NAME / STAFF NO. and SIGNATURE attendance fields.

CRITICAL STOP, WITHDRAW AND RESTART RESTRICTIONS

The source orders a stop when tension or isolation is unverified, material remains unstable, a trip wire is disabled, smoke is present or remote start lacks approval. Never clear hang-ups by exposing people to stored material or restarting without operator authorisation.

BUY THE SINGLE OR THE FULL UNDERGROUND COLLECTION

This R12.95 original editable AM-TT02 Word record is already included in the 371-original Underground Mining Checklist Package and the complete 628-page Contractor H&S File. Owners of either containing collection need not buy the same original again. Actual mine permits, competent isolation, controlled chute access, fire safety and authorised production release govern use.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

Underground Mining Checklist Package — 371 originals

Complete 628-page Underground Contractor Safety File

    bottom of page