219 - AM-C04 | Airport NAVAID FOD & Tool Accountability Check
Buy 4 Checklists, Get 1 Free
SOURCE-ORIGINAL PURPOSE
This AVC source-original aviation workfront verification checklist is for airport navaid fod & tool accountability check. Small fasteners and temporary tools near navigation equipment create FOD and interfere with permitted operational zones. It is designed for an actual approved airport work package rather than generic construction compliance.
WHEN AND HOW TO USE IT
Record the actual AIRPORT/AREA or WORK ZONE, asset, permit/work order and shift/date wherever those fields appear on the source. Verify the competent specialist, airport custodian, access arrangements and current operating window before proceeding. Stop after changes to flight operations, radio/meteorological equipment or the permitted system condition.
THE AUTHENTIC PRINTED POINTS
The original Word prints 8 numbered checks or hold gates: 1. A signed tool and loose-item issue/return count covers every person entering the worksite. 2. Consumables, packaging, rags, fixings, fasteners and cut-offs are contained and reconciled. 3. Waste and temporary covers are secured against aircraft jet blast, wind and rotor downwash. 4. The workfront is free of exposed wires, loose bolts, sharp edges and loose particles. 5. NAVAID signal interference — prevent objects and debris arising from this activity. 6. System owner authorisation — physical check completed with supervisor. 7. The approved collection route avoids live aircraft stands and baggage/security paths. 8. A final sweep and independent FOD check are recorded before area handback.
EVIDENCE AND SIGNATURES
The source expects real YES/NO/N/A or HOLD evidence as applicable, with reviewer, unresolved defect, corrective action and airport release reference. Leave failed checks open until a competent authority decides.
SYSTEM OWNER AND AIRPORT RELEASE
Aviation communications, navigation aids and weather-monitoring equipment can be flight-critical. The correct airport/aviation systems authority controls RF energy, safe access, outages, independent calibration or tests and return to service. Contractor completion is not equivalent to an operator's release.
ORIGINAL WORD AND AVC FILE OPTIONS
Buy this exact editable AVC original Word DOCX for R12.95 individually, or find the identical document already included in the 420-document Airports & Airside Checklist Package and the full 659-page Airports Contractor H&S File. Avoid duplicate buying. Eligible individual Singles may qualify for BUY 4 GET 1 FREE while the automatic cart offer applies (5 pay for 4, 10 for 8, 15 for 12); confirm at checkout. Packages are excluded. Airport work permits and system release remain separate.

