AM-F01 — CONVEYOR HOLD, RELEASE & MINE HANDOVER RECORD
AM-F01 is the original five-stage hold/release and mine handover record for underground belt conveyors, chutes and handling plant. It controls mine energy isolation windows, securing stored material, guarded first-jog tests and mine acceptance before introducing ore.
WHEN TO USE THIS SOURCE
Use at critical commissioning or conveyor maintenance stages. Identify Underground mine / site, Company, Area / equipment, Permit / work order, Supervisor and Host-mine work owner and keep the operator's actual work authorisation reference.
FIVE ACTUAL MINE HOLD POINTS
1. Operations and energy-isolation window approval
2. Chute hang-up/material release and mine rescue controls
3. Belt tension/guarding and fire-system inspection
4. First jog, alarms/pull wires and start-up tests
5. Mine plant-owner acceptance before material feed
HOW TO COMPLETE THE SOURCE
Mark each of five genuine STEP / HOLD / STOP POINT entries Hold, Release or N/A, complete VERIFIER / RECORD with evidence/time/signature, and obtain separate mine witness confirmation for isolation, chute rescue, guards/fire, pull wires and accepted material-feed release.
MINE SAFETY AND RESTART RELEASE
The source states NO RELEASE if a required technical hold, operator permit or mine acceptance is missing. Contractor final acceptance differs from the HOST-MINE RELEASE signature; only competent mine authority returns plant to service.
SINGLE WORD OR FULL MINE PACKAGE
This R12.95 source-original AM-F01 editable Word is already in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either complete collection should avoid duplicate purchases. Actual mine permissions, isolation, fire protection and competent operator release always prevail.