208 - AM-C01 | Conveyor & Chute Ten-Point Task Prestart Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95
AM-C01 — CONVEYOR & CHUTE TEN-POINT TASK PRESTART CHECKLIST
AM-C01 is the actual TEN-point mine conveyor/chute prestart, covering stored energy, mud rush, fire, smoke, emergency trips, dust/gas, separate chute rescue permission, barriers, equipment loading and the mine-accepted production restart.
WHEN TO USE THIS SOURCE
Use before a conveyor drive, belt, crusher or loading pocket task. Enter Underground mine / site, Contractor / company, Area / zone, Date / shift, Work order / activity and Supervisor. Explain every N/A under host-mine procedure.
TEN ORIGINAL CONVEYOR PRESTART SAFETY CHECKS
1. Operations owner has approved machine, workplace, worker list and contractor work window.
2. LOTO includes electrical, mechanical, belt tension, counterweights and remote-start signals.
3. Material hang-up/bridging, mud rush, chute collapse and engulfment assessed/cleared by mine competent person.
4. Underground belt fire prevention, smoke migration and designated fire protection verified.
5. Conveyor guarding, pull wires, pre-start alarms and emergency stops reinstated.
6. Transfer point ventilation/dust/gas monitoring and combustible accumulation controlled.
7. Confined chute/bin entry requires separate host authority and prepared rescue.
8. Headroom, void, access and traffic barriers provided at belt drive and loading area.
9. Replacement parts/tensioning/lifting approved for transport, mass and anchorage capacity.
10. Run-test and production restart authorised and accepted by mine control.
HOW TO COMPLETE THE SOURCE
Enter YES/NO/N/A and EVIDENCE / ACTION for ten printed RELEASE / VERIFICATION POINT rows. Include work window, electrical/mechanical/counterweight/remote start LOTO, unstable material, fire controls, trip circuits, ventilation, chute confined entry, safe barriers, mass-rated lifting and mine run test.
MINE SAFETY AND RESTART RELEASE
The source RELEASE RULE requires operator-owned holds cleared before work begins; mine/host signature is separate from contractor check. Do not bypass any failed safety control.
SINGLE WORD OR FULL MINE PACKAGE
This R12.95 source-original AM-C01 editable Word is already in the 371-original Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either complete collection should avoid duplicate purchases. Actual mine permissions, isolation, fire protection and competent operator release always prevail.
THREE BLUE AVC PRODUCT LINKS

