208 - AM-C01 | Mine Scaffolding Ten-Point Pre-Start Checklist
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check cart.
208 / AM-C01 — MINE SCAFFOLDING & HEIGHT WORK TEN-POINT PRE-START
AM-C01 is the original editable TEN-POINT mine work-at-height TASK READINESS and pre-start checklist for pit edges, scaffolds, MEWPs and specialist access. It addresses full mine-zone authorisation from rescue readiness to controlled scaffold alterations, not only the condition of a harness.
WHY MINE HEIGHT WORK NEEDS TEN VERIFICATIONS
Surface mines combine exposed highwalls, open shafts, fragile roofs, moving haulage, electrical crossings and difficult emergency access. Sudden wind or blasting vibration can change the status of an apparently safe platform. Each printed source control demands real evidence before the mine operator releases access.
TEN ACTUAL MINE WORKFACE PRE-START CONTROLS
1. Height-work rescue, mine emergency link and authorisation. 2. Classification/release of roofs, pit edges, shafts and fragile surfaces. 3. Competent scaffold and temporary platform erection/inspection. 4. Suitable anchor and fall-arrest design and inspection. 5. MEWP/boom-lift approved routes and operating limits.
6. Dropped-object exclusion and mine traffic segregation. 7. Wind, lightning and weather restrictions briefed. 8. Overhead electrical installation/clearance risks. 9. Remote access communications and response readiness. 10. Controlled handover for altered or dismantled scaffolds.
ORIGINAL WORD FIELDS AND MINE SIGNOFF
The original form contains TEN RELEASE / VERIFICATION POINTS with YES, NO, N/A and EVIDENCE / ACTION. Fields identify Mine/site, Area/zone, Work order/activity, Contractor/company, Date/shift and Supervisor. Unlike shorter seven-point reassessments, it includes rescue, fragile surfaces, scaffold competence, fall-arrest design, MEWP routes, drop zone, weather, electrical proximity, remote access and modification handback.
Source RELEASE RULE: all applicable high-risk and operator-owned holds must be released before work. CONTRACTOR CHECK and MINE / HOST RELEASE have distinct signatures and DATE / REFERENCE. Explain and file every N/A, and STOP on a failed critical control; the form itself is not an access permit.
THIS WORD SINGLE OR THE COMPLETE SURFACE MINE FILE?
This same original purchaser-licensed editable Word DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and the complete Surface Mining Contractor H&S File. Buy either wider collection to receive this form with mine site controls, specialist annexures and other safety workpacks without purchasing the individual document again. Host mine permits and work-at-height authority remain required.