top of page

205 - AL-TT03 | Critical Lift Shift Interface & Emerging Risks

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying Singles: five for four, ten for eight or fifteen for twelve. Check the cart offer.

Browse all checklist Singles

205 / AL-TT03 — CRITICAL LIFT SHIFT INTERFACE & EMERGING RISK TOOLBOX TALK

AL-TT03 is the original editable six-point shift-interface and emerging-risk toolbox talk for mine cranes and lifting contractors. The FIRST original point is recorded load mass, centre of gravity and certified lift points, rather than beginning with a generic machinery inspection.

WHAT MINE LIFTING FAILURE THIS FORM HELPS PREVENT

An incoming lift team can have a safe-looking crane setup but no evidence that fill beneath an outrigger has sufficient bearing capacity or that the latest road diversion is approved. A changed sling arrangement or wind limit may also invalidate the engineered lift study. This form helps the team coordinate current mine, transport and rigging decisions.

SIX ORIGINAL CRITICAL LIFT BRIEFING POINTS

1. Record load mass, centre of gravity, certified lift points and lifting study. 2. Geotechnical evaluation of outrigger bearing near benches, dumps and fill. 3. Check overhead conductor/communication line clearance for the actual configuration.

4. Mine dispatcher authorises haul-road closure and exclusion from moving plant. 5. Confirm current crane, tackle, rigger and signaller inspection/competence. 6. Define highwall wind/gust limits and suspended-load travel restrictions.

REAL SOURCE FIELDS AND MINE AUTHORITY

The six source points follow lifting calculations, bearing/ground engineering, overhead clearances, mine dispatch, equipment/people competence and wind limits. It has a separate 16-line crew attendance section and mine zone/shift/presenter fields, not a numerical ground pressure calculation sheet.

STOP / WITHDRAW / NOTIFY MINE CONTROL on ground settlement, lifting-capacity doubt, loss of signal, high wind, unverified lift point or unexpected mine traffic in the exclusion. Restart requires host mine authority.

THIS EDITABLE SINGLE OR THE COMPLETE MINING COLLECTION?

This same original purchaser-licensed editable Word DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and complete Surface Mining Contractor H&S File. Buyers of either larger collection receive this exact document with other specialist lift records and mining site controls without purchasing the Single again. Mine-specific lifting plans, equipment certification, transport permission and releases always remain controlling.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page