top of page

204 - AL-TT02 | Work-at-Height Rescue in Confined Mine Headings Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AL-TT02 — WORK-AT-HEIGHT RESCUE IN CONFINED MINE HEADINGS TALK

AL-TT02 is the real FIVE-point rescue-planning toolbox for working at height inside restricted underground mine headings. It focuses on dropped-object exclusion, adequate lighting and emergency refuge, mine-permitted platforms, isolated plant and continuously viable rescuer access.

WHERE TO USE THE ORIGINAL MINE DOCUMENT

Use when an approved scaffold, mobile platform or work-at-height activity occurs inside a confined or difficult-to-reach mine zone. Identify Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref using real mine controls.

FIVE SPECIALIST HEIGHT AND RESCUE CONTROL POINTS

1. Dropped-object and ore/pass/chute opening exclusion controls in place.

2. Underground lighting, communication and emergency refuge reachability adequate.

3. Mobile platforms permitted by underground road/ventilation/winder limits.

4. Electrical, conveyor, ventilation and process interfaces isolated to approved plan.

5. Confirm rescue access, communication and refuge arrangements will remain viable throughout the elevated task.

HOW TO COMPLETE THIS SOURCE-ORIGINAL WORD

Discuss five source-listed controls in order: exclusion at ore-pass and chute edges, emergency communication/refuge reachability, permitted mobile platforms under ventilation/road/winder limits, power/conveyor/ventilation/process isolation and rescuers' continuous access during the elevated task. Complete NAME / STAFF NO. and SIGNATURE attendance.

MINE STOP-WORK AND RESCUE AUTHORITY

Stop for unknown anchor capacity, ground support doubts, absent tested rescue, blocked refuge, unsafe ventilation or dropped object exposure. This briefing alone is never a rope-access permit, mine entry clearance or substitute for competent rescue planning.

BUY ONE WORD ORIGINAL OR THE COMPLETE MINE PACKAGE

This R12.95 editable AL-TT02 original Word record is already included in the 371-original Underground Mining Checklist Package and full 628-page Contractor H&S File. Owners of either collection should avoid purchasing the same Single again. Approved mine ground control, valid anchor engineering, assessed rescue access, emergency refuge and mine-authorised area release always govern its use.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

628-page Underground Mining Contractor H&S File

    bottom of page