201 - AL-T01 | Mine Crane Rigging Inspection & Test Record
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: five for four, ten for eight or fifteen for twelve. Confirm the cart.
201 / AL-T01 — MINE CRANE RIGGING INSPECTION AND TEST RECORD
AL-T01 is the original editable seven-row mine lifting WORK INSPECTION & TEST RECORD for crane, rigging and load movement tasks. It documents actual RESULT / MEASUREMENT and SOURCE / SIGN-OFF across crane certification, engineered planning, ground bearing and restoration of mine operations.
WHY THESE ACTUAL MINE LIFT RESULTS MATTER
A crane lift can reach its intended landing while the hauling road remains closed, lifting tackle goes unchecked or temporary attachments remain in place. A missing ground-bearing record or independent critical-lift deviation acceptance may also invalidate completion. The receiving mine needs a real evidence trail, not seven empty ticks.
SEVEN SOURCE-PRINTED TEST / EVIDENCE ITEMS
1. Crane equipment and lifting tackle certification. 2. Certified load data and actual lift plan revision. 3. Rigging/prelift inspection and briefing evidence. 4. Outrigger/ground bearing and setup verification.
5. Witnessed critical lift hold points and deviations. 6. Load installation/landing and formal release. 7. Post-lift inspection and mine traffic restoration.
ACTUAL ORIGINAL WORD RESULTS AND SIGNOFF
The printed columns are TEST / COMPLETION RECORD, RESULT / MEASUREMENT and SOURCE / SIGN-OFF; seven numbered source rows. Enter Mine/site, Item/System/Asset ID, Drawing/Revision, Contractor, Work Order and Activity Date, and secure separate CONTRACTOR SUPERVISOR and RECEIVING MINE REPRESENTATIVE signatures. No blank space is evidence of completion.
Record the genuine lift asset IDs, tested results, witnessed decisions and mine-controlled source documents. Incomplete or defective lift-control evidence stays on HOLD and cannot be resolved by contractor-only signing.
INDIVIDUAL EDITABLE WORD OR COMPLETE MINE COLLECTION?
This exact purchaser-licensed original editable DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and full Surface Mining Contractor H&S File. Buying either larger set includes this Single along with the other specialist crane controls and site-management forms. A complete set purchaser need not buy it again. Mine-issued lift planning, dispatch and access releases always govern.

