200 - AL-R03 | Scaffold Inspection & Technical Evidence Register
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AL-R03 — SCAFFOLD INSPECTION & TECHNICAL EVIDENCE REGISTER
AL-R03 is the genuine seven-point inspection and technical-evidence register for underground scaffolding, overhead work and rope access near mine voids. Its first evidence item is rock-engineering authorisation of ground/support anchors and its final item requires a competent first-use or changed-condition scaffold inspection.
WHERE AND WHEN THIS MINE RECORD APPLIES
Use to capture mine-controlled evidence before access, after alteration and at final inspection. Record MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR and cite the specific engineered access design and fall-rescue plan.
SEVEN SOURCE UNDERGROUND HEIGHT EVIDENCE ITEMS
1. Ground or support attachment for work-at-height equipment authorised by rock engineering
2. Shaft, ore-pass, stope and raise-edge openings positively barricaded
3. Rescue plan explicitly addresses mine travel time and underground access
4. Scaffold footing designed for uneven, wet or unstable underground substrate
5. Dropped-object containment protects workers, belts and services below
6. Access system does not obstruct ventilation, tracking, fire and refuge paths
7. Competent inspector performs first-use and changed-condition scaffold checks
COMPLETING THE REAL ORIGINAL WORD FIELDS
Fill the genuine seven source items under MINING-SPECIFIC ITEM / EVIDENCE TO TRACK, DOCUMENT / RESULT / MEASURED VALUE and DATE / AUTHORITY / STATUS. Reference ground-control signatures, stope/shaft/raise barricades, tested underground rescue travel time, wet footing stability, dropped-object controls and fire/refuge routes.
STOP-WORK, ROCK ENGINEERING AND MINE RELEASE
The original provides a separate outstanding defect/NCR/reinspection retention line and contractor plus host-mine review references. Scaffold tags, anchorage and fall rescue remain subject to the mine's competent approval before work can continue.
EVIDENCE OWNERSHIP AND BUYER GUIDANCE
This R12.95 original AL-R03 editable Word file is also included in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either collection should not buy a duplicate. Actual mine ground-control approvals, fall-prevention engineering, competent scaffold inspection, dedicated rescue preparedness and mine-owned permissions always govern work.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

