2 - AB-01-C01 | Underground Jurisdiction, Mine Type & Scope Decision
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE ORIGINAL EDITABLE WORD | R12.95
AB-01-C01 — UNDERGROUND JURISDICTION, MINE TYPE & SCOPE DECISION
This editable AB-01-C01 original underground mine workface verification document contains 8 genuine printed source release and verification points. It is not a generic substitute and does not issue mine approval.
SOURCE-ORIGINAL UNDERGROUND MINE APPLICATION
Use for Underground Jurisdiction, Mine Type & Scope Decision at the correct mine, level, working area and operator-controlled task. Record the mine company, work order, supervisor, permit, area-specific risk assessment and appointed host officials before work.
8 ACTUAL UNDERGROUND MINE VERIFICATION ITEMS
1. Confirm legal mine boundary, employer, jurisdiction and actual underground work zone.
2. Declare COAL / HARD ROCK / OTHER and known gas/flammable-dust classification; no default assumptions.
3. Map mine manager, statutory engineering, ventilation, survey and ground-control legal duty holders.
4. Identify contracted scope, exclusions and production/stope/shaft work requiring separate authorisation.
5. Obtain current site safety-file approval checklist and host codes of practice.
6. Document the work-area hazards, mine restrictions, underground permitted equipment and change conditions.
7. Select AC–AO trade annexures only when tasks are authorised under actual work order.
8. Ensure mixed surface/underground crossings trigger an updated work-area classification and permit.
USING AND COMPLETING THE EDITABLE WORD SOURCE
Tick each printed RELEASE / VERIFICATION POINT YES, NO or N/A, explain failures in EVIDENCE / ACTION and include real site-specific evidence, operator approval and competent person decision.
CRITICAL MINE AUTHORITY AND STOP WORK
A critical NO, failed gate, incomplete inspection, unsafe zone or missing mine technical work release requires STOP, escalation and competent operator re-authorisation before work proceeds. Contractor sign-off alone never grants mining permission.
INDIVIDUAL SOURCE OR COMPLETE MINE COLLECTION
This R12.95 AB-01-C01 source-original Word is included in the 371-document Underground Mining Checklist Package and 628-page Contractor Health and Safety File. Existing owners should avoid duplicate purchases. Site adaptation and mine-owned permission remain mandatory.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

