197 - AL-H02 | Scaffold Witness Hold & Mine Return-to-Service Gate
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AL-H02 — SCAFFOLD WITNESS HOLD & MINE RETURN-TO-SERVICE GATE
AL-H02 is the source-original FIVE-gate witness hold and mine return-to-service record for scaffolds, height work, rope access and mine void-edge maintenance. Its first gate requires competent rock-engineering authorisation of anchor or support attachment.
WHERE AND WHEN THIS MINE RECORD APPLIES
Use before advancing a critical height-access work phase or releasing a mine area after alteration and dismantling. Enter MINE / AREA / LEVEL, WORK ORDER / MINE ZONE, DATE / SHIFT / PERMIT and CONTRACTOR SUPERVISOR, identifying the mine work owner and independent witnesses.
FIVE GENUINE INDEPENDENT MINE WITNESS GATES
1. Ground or support attachment for work-at-height equipment authorised by rock engineering
2. Shaft, ore-pass, stope and raise-edge openings positively barricaded
3. Rescue plan explicitly addresses mine travel time and underground access
4. Scaffold footing designed for uneven, wet or unstable underground substrate
5. Dropped-object containment protects workers, belts and services below
COMPLETING THE REAL ORIGINAL WORD FIELDS
Complete the actual HOLD TRIGGER / EVIDENCE GATE, REQUIRED EVIDENCE / VERIFICATION and RESULT / REFERENCE / WITNESS cells for rock-ground attachment, shaft/ore-pass/stope/raise-edge barriers, travel-time rescue planning, wet/unstable footing design and dropped object protection.
STOP-WORK, ROCK ENGINEERING AND MINE RELEASE
Every applicable hold must PASS, evidence must reference the approved work order, and defects must be corrected and witnessed. Only a named mine authority may issue return-to-service permission; a contractor's recorded hold release is not mine area clearance.
EVIDENCE OWNERSHIP AND BUYER GUIDANCE
This R12.95 original AL-H02 editable Word file is also included in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Owners of either collection should not buy a duplicate. Actual mine ground-control approvals, fall-prevention engineering, competent scaffold inspection, dedicated rescue preparedness and mine-owned permissions always govern work.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

