top of page

196 - AL-F01 | Scaffold Hold, Release & Mine Handover Record

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — ORIGINAL EDITABLE WORD | R12.95

AL-F01 — SCAFFOLD HOLD, RELEASE & MINE HANDOVER RECORD

The five-stage hold/release Word form controls ground/void permission, engineered scaffold anchorage, self-rescue and refuge, mobile access/dropped-object checks, and mine handover. It carries separate contractor and mine signatures.

WHERE THIS MINE FORM IS USED

Use at every critical work-at-height phase. Enter Underground mine / site, Company, Area / equipment, Permit / work order, Supervisor and Host-mine work owner. Identify actual area, access arrangement, authorised people and valid host-mine stage permission.

FIVE ORIGINAL HOLD AND RELEASE STAGES

1. Mine ground/void-edge and special-access permit

2. Scaffold/anchor design and competent erection release

3. Rescue plan, self-rescuer and refuge route acceptance

4. Height-work/MEWP access and dropped-object checks

5. Dismantling, barrier restoration and host handover

HOW TO COMPLETE THE ORIGINAL FIELDS

Complete five source STEP / HOLD / STOP POINT entries as Hold, Release or N/A, with actual VERIFIER / RECORD evidence, time, signatures, competent engineering and access proof. Keep each stage closed before moving to the next.

CRITICAL STOP-WORK AND MINE RELEASE RULE

NO RELEASE IF a witnessed technical hold, required permit or mine acceptance is missing. A contractor release does not replace HOST-MINE RELEASE; stop where support, rescue or edge protection is uncertain.

WHY THIS EDITABLE SOURCE BELONGS IN A CONTROLLED FILE

This source Word form retains the original layout, printed record sequence and mine-specific evidence fields. Record observations, actual inspection results, signatures and current engineering approval. It cannot replace a mine-issued permit, rescue plan or statutory appointment.

BUY ONE SINGLE OR THE COMPLETE UNDERGROUND PACKAGES

This R12.95 AL-F01 editable Word original is included in the 371-document Underground Mining Checklist Package and complete 628-page Contractor H&S File. Buyers who own either complete collection should avoid duplicate purchases. Mine-controlled fall rescue, anchorage, engineered access and operator release always govern work.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Complete 628-page Underground Mining Contractor H&S File

    bottom of page