top of page

195 - AL-C03 | Critical Lift Exposure & Emergency Safeguards

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check your cart.

Browse all checklist Singles

195 / AL-C03 — CRITICAL MINE LIFT EXPOSURE & EMERGENCY SAFEGUARDS

AL-C03 is the original editable seven-control CRITICAL EXPOSURE AND EMERGENCY SAFEGUARDS checklist for surface-mine crane and specialist lifting work. Its first source item addresses overhead conductor clearance; its last requires actual load mass and certified lift-point evidence.

WHY THIS ORIGINAL LIFTING CONTROL MATTERS

Contact with powerlines, unplanned haul truck movement under a suspended load or untested emergency lowering can create a serious incident despite an otherwise engineered crane lift. Exposed highwall weather adds an additional constraint. This seven-point workface control connects emergency protection with independent mine-authorised lifts.

SEVEN SOURCE WORKFACE SAFETY CHECKS

1. Check overhead power/communication conductor clearance against actual lift setup. 2. Mine dispatcher authorises haul-road closures and mobile-plant exclusion. 3. Crane, rigging tackle, signallers and riggers have current inspection/competence. 4. Define wind/gust limits and highwall suspended-load travel constraints.

5. Confirm test lift, independent hold/witness and emergency lowering route. 6. Certify safe load landing and removal of temporary attachments before restart. 7. Record actual load mass, centre of gravity, lift points and engineered study.

ACTUAL EDITABLE SOURCE FIELDS AND RELEASE

SEVEN genuine WORKFACE VERIFICATION / REQUIRED CONTROL rows use Y / N / N/A and EVIDENCE / DEFECT / ACTION. Identify mine/pit/work area, work order/mine zone, date/shift/permit and contractor supervisor. It is not a crane load chart or an automatic lift permit. Record actual mine-approved studies, hold releases, conductor clearance and dispatcher decisions.

HOLD for missing clearance, isolation, technical protection or critical evidence and reassess changing conditions. CONTRACTOR SUPERVISOR and MINE RELEASE AUTHORITY signatures plus DATE / RELEASE REF are separate, even when the equipment is fully certified.

BUY THIS SINGLE OR THE COMPLETE MINE COLLECTION?

This identical original purchaser-licensed editable Word DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the full Surface Mining Contractor Health and Safety File. Buyers of the larger collections receive this same specialist lifting control with other mining management and trade documents, without purchasing the Single a second time. Host mine lifting and dispatch authority remains controlling.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page