top of page

194 - AL-C02 | Mine Crane Changed Conditions Reassessment

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Qualifying AVC Singles: five for four, ten for eight or fifteen for twelve. Check your cart.

Browse all checklist Singles

194 / AL-C02 — MINE CRITICAL LIFT CHANGED CONDITIONS AND REASSESSMENT

AL-C02 is the original editable seven-row CHANGED CONDITIONS AND WORKFACE RE-ASSESSMENT checklist for critical lifts next to mine edges, structures and live haul roads. It is particularly useful when blasting, a shift change, rain, wind or a revised lifting machine setup affects the original approved lift plan.

WHY THIS ORIGINAL LIFTING CONTROL MATTERS

Outrigger loads may be unsafe on changed backfill after rain or blast vibration. A boom moved to a new orientation may intrude into overhead clearance or obstruct mine traffic differently. Contractor crews cannot rely on a previously accepted lift plan when the workface or mine dispatch restrictions have changed.

SEVEN SOURCE WORKFACE SAFETY CHECKS

1. Reassess outrigger bearing near benches, dumps and backfill. 2. Check overhead conductors and communication lines against new crane configuration. 3. Confirm mine haul-road closure and transport/dispatcher authorisation. 4. Reverify lifting tackle, rigger/signaller competence and crane certification.

5. Review gust and suspended-load travel limits at exposed highwalls. 6. Confirm test lift, independent witness and emergency lowering access. 7. Ensure final load, temporary attachments and mine restart certified safe.

ACTUAL EDITABLE SOURCE FIELDS AND RELEASE

Seven printed source questions start with geotechnical ground-bearing proof and end with safe operational handback. All use Y, N, N/A and EVIDENCE / DEFECT / ACTION; record the true work order, pit/zone, date/shift/permit and supervisor. The original does not supply numerical wind or load thresholds; refer to the current approved mine lift study.

The source HOLD requires stopping on missing clearance, isolation, protection or critical evidence, and a new mine release decision for changed conditions. Contractor and MINE RELEASE AUTHORITY signatures with DATE / RELEASE REF identify the accepted status.

BUY THIS SINGLE OR THE COMPLETE MINE COLLECTION?

This identical original purchaser-licensed editable Word DOCX is ALREADY INCLUDED in the 386-document Surface Mining Checklist Package and in the full Surface Mining Contractor Health and Safety File. Buyers of the larger collections receive this same specialist lifting control with other mining management and trade documents, without purchasing the Single a second time. Host mine lifting and dispatch authority remains controlling.

386-document Surface Mining Checklist Package

Complete Surface Mining Contractor H&S File

    bottom of page