191 - AM-H02 | Critical Lift Configuration & Witness Hold Gates
Buy 4 Checklists, Get 1 Free
POWER PLANT LIFTING SAFETY PURPOSE
Source-original AVC AM-H02 editable Word for power plant contractors engaged in Rigging, Cranes, Hoists and Critical Lifting near operating turbines, generators and maintenance outage workfaces. This specific source addresses independent approval of critical lifting plan, rigging/COG, blind or tandem lift and engineered final landing. Cranes and suspended loads cannot be operated on assumed ground capacity, unknown loads or unverified personnel authorisation.
WHEN TO COMPLETE THE ORIGINAL
Complete against the real CONTRACT / UNIT, WORK PACKAGE / ASSET, DATE / SHIFT and PERMIT / REVISION or SITE / UNIT and work-zone fields. Confirm certified crane radius/load chart and lifting tackle, engineered ground/outrigger load, verified mass/centre of gravity, rated lifting points, exclusion zone, competent lift director and signaller, weather stop limit and station operator permit before lifting.
REAL PRINTED WORD CRITERIA
The genuine Word contains 4 numbered technical STOP, HOLD, inspection or activation controls: 1. Critical lift-plan acceptance before crane set-up; 2. Final rigging configuration and load/COG approval; 3. First lift off support / tandem lift / blind lift; 4. Release of load at engineered landing / post-lift area clearance.
LIFT CERTIFICATES, WITNESS OR CREW EVIDENCE
Four independent witness gates protect approval of the lift plan, rigging configuration and centre of gravity, first or tandem/limited-visibility lift and approved landing/area clearance.
SEPARATE STATION AND LIFT AUTHORITY
The appointed lifting machinery inspector/competent supervisor and station owner each retain their own authority. Neither an AVC checklist nor a signed crew briefing permits critical lifts, crane movements across live plant, changes to approved rigging, hazardous proximity or facility return to service. Stop the lift for lost communications, wind threshold or abnormal load movement.
LOAD, RIGGING AND WORK AREA HANDOVER
Before handback reconcile lifting tackles, sling and shackle certificates, equipment tags, temporary jacks or supports, ground-protection measures and engineered laydown restraints. Record any defect, excess movement, crane/outrigger settlement and final lift evidence, then obtain a real technical reviewer and independent station-area release.
SOURCE ORIGINAL WORD AND AVC FILES
This authentic editable source-original AVC Word Single is R12.95. The same form is already included in the complete 277-document Power Generation & Industrial Outage Checklist Package and 525-page Contractor H&S File; avoid buying identical sources twice. Eligible Singles may qualify for BUY 4 GET 1 FREE while the automatic checkout offer applies (five pay for four, ten for eight and fifteen for twelve). Confirm checkout; packages excluded.

