190 - AK-TT03 | Rigging Shift Change & Workface Lessons Talk
Buy 4 Checklists, Get 1 Free
BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE
Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.
UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95
AK-TT03 — RIGGING SHIFT CHANGE & WORKFACE LESSONS TALK
Original six-control underground rigging shift handover briefing, beginning with correct lifting class, load mass and centre of gravity followed by independent mine approval for suspension anchor points.
WHERE TO USE THIS ORIGINAL MINE RECORD
Use when transferring lifting operations between shifts or revising the load route. Record MINE / AREA / DATE / SHIFT, PERMIT / PRESENTER, competent rigger and relevant signal and mine owner.
SIX ORIGINAL RIGGING TOOLBOX CONTROLS
1. Mine lifting classification, load mass and centre of gravity verified
2. Underground anchor or hanging point is independently approved for load
3. Shaft conveyance dimensions, weight and lifting point declarations accepted
4. Rigger/signaller competence, radio calls and exclusion zones approved
5. Headroom and ground support clearance validated along entire load path
6. Crane, chain block, hoist and rigging certificates in date
HOW TO COMPLETE THE ACTUAL PRINTED SOURCE
Discuss all six original rows and record the 16 original crew signature lines. Verify accurate shaft conveyance dimensions, approved lifting points, competent signals, exclusion zones, headroom and current certificates.
CRITICAL STOP-WORK AND MINE AUTHORITY
A previous shift's permit cannot override current load mass or ground conditions. Unknown anchor capacity, failed communication, obstruction of emergency egress or unauthorised winder access means STOP and mine-owner notification.
TECHNICAL EVIDENCE, TEST RESULTS AND CREW ACCOUNTABILITY
Retain the actual mine lifting class and work-order permission, engineer-accepted suspension capacity, current certificates, communication and exclusion proof. Confirm actual machine or shaft access restrictions and competent witness signatures before use; never assume the contractor can issue mine lifting authorisation.
BUY A SINGLE WORD FILE OR THE COMPLETE MINE COLLECTION
This R12.95 authentic editable AK-TT03 Word record is already included in the 371-original Underground Mining Checklist Package and the complete 628-page Contractor H&S File. Owners of either containing collection should avoid duplicate purchases. Mine-appointed lifting, shaft transport and engineering authority always governs the work.
THREE BLUE AVC PRODUCT LINKS
Browse AVC original checklist Singles

