top of page

189 - AK-TT02 | Shaft Conveyance Interfaces & Load Declarations Talk

R 12,95Price

Buy 4 Checklists, Get 1 Free

BUY 4 INDIVIDUAL CHECKLISTS, GET 1 FREE

Eligible Singles: add 5 and pay for 4; add 10 and pay for 8; add 15 and pay for 12, while the promotion is active and the cart qualifies. Confirm the discount before checkout.

UNDER GRD MINE — SOURCE-ORIGINAL EDITABLE WORD | R12.95

AK-TT02 — SHAFT CONVEYANCE INTERFACES & LOAD DECLARATIONS TALK

Specialist five-point shaft conveyance and load-declaration toolbox talk. It addresses cage dimensions, load security, blind corners, roadway constraints and engineering for special or tandem lifts.

WHERE TO USE THIS ORIGINAL MINE RECORD

Use before mine transport and shaft movement of contractor equipment. Enter Mine / area, Contractor, Date / shift, Presenter, Work order / task and Risk assessment ref with genuine mine logistics and conveyance documents.

FIVE ORIGINAL SPECIALIST LIFTING TOOLBOX CONTROLS

1. Transport carriage dimensions, load security and shift communication agreed.

2. Workers kept out of blind corners, nip points and suspended load risk envelope.

3. Floor/road gradient, limited headroom and underground vehicle interaction controlled.

4. Special lifts, tandem lifts and recovery loads require task-specific approved engineering plan.

5. Recheck loads, dimensions, cage clearances and declared lifting points before each conveyance or handover.

HOW TO COMPLETE THE ACTUAL PRINTED SOURCE

Discuss all five actual printed items, with declared mass and dimensions, personnel exclusion from suspended-load paths, low headroom and safe vehicle interaction. Recheck carriage and cage clearances at every handover; obtain crew signatures.

CRITICAL STOP-WORK AND MINE AUTHORITY

Stop on unapproved mine winder entry, underrrated anchors, unsafe shaft clearance, failed signals or a conveyance plan not accepted by responsible mine authority. The talk itself does not issue permission.

TECHNICAL EVIDENCE, TEST RESULTS AND CREW ACCOUNTABILITY

Retain the actual mine lifting class and work-order permission, engineer-accepted suspension capacity, current certificates, communication and exclusion proof. Confirm actual machine or shaft access restrictions and competent witness signatures before use; never assume the contractor can issue mine lifting authorisation.

BUY A SINGLE WORD FILE OR THE COMPLETE MINE COLLECTION

This R12.95 authentic editable AK-TT02 Word record is already included in the 371-original Underground Mining Checklist Package and the complete 628-page Contractor H&S File. Owners of either containing collection should avoid duplicate purchases. Mine-appointed lifting, shaft transport and engineering authority always governs the work.

THREE BLUE AVC PRODUCT LINKS

Browse AVC original checklist Singles

371-original Underground Mining Checklist Package

Complete 628-page Underground Mining Contractor H&S File

    bottom of page